Laserfiche WebLink
CIRCES Cost Estimating Software <br />TRUCK/LOADER TEAM WORK <br />21.60 <br />31.70 <br />26.65 <br />30.94 <br />27.06 <br />PROJECT IDENTIFICATION <br />Agency or organization name : Division Of Reclamation, Mining And Safety <br />Task #: 054 State : Colorado Permit/job #: C2009 -087 <br />Date : 0311612010 County : Routt Abbreviation : none <br />User: JHB Site Peabody Sage Creek Mine Filename C087 -054 <br />Permit or other job action : New application <br />Task description Haul backrill material from South Facilities area to portal f.u. <br />-- 32_�.A _,� __ _, .w _. _ ._.m_.. _... w _ --------- ._ e . <br />HOURLY EQUIPMENT COS Shift basis : 1 per day <br />lEouinment Descriotion <br />Truck/loader team -Truck <br />-Loader <br />Cat 769D <br />CAT 988G (2005) <br />Support equipment -Load area <br />-Dump area : <br />Cat D10R - 10SU (2005) <br />Cat D10R - 10SU (2005) <br />Road maintenance -Motor grader: <br />-Water truck <br />NA <br />Water Tanker, 10,000 Gal. <br />Cost Breakdown : <br />Truck/Loader Work Team <br />Truck I Loading Tool <br />Support Equipment <br />Load Area Dump Area <br />Road Maintenance Equipment <br />Motor Grader Water Truck <br />Import data filename : <br />truck2 <br />loader <br />dozer <br />dozer <br />NA <br />misctruk <br />% Utilization-machine: <br />100 <br />91 <br />100 <br />100 <br />NA <br />25 <br />- Ripper attachment: <br />NA <br />NA <br />20 <br />NA <br />NA <br />NA <br />Ownership cost/hour: <br />$52.27 <br />$62.60 <br />$76.61 <br />$76.61 <br />NA <br />$62.58 <br />Operating cost/hour : <br />$69.57 <br />$69.26 <br />$128.30 <br />$128.30 <br />NA <br />$21.28 <br />Ripper op. cost/hour : <br />NA <br />NA <br />$0.00 <br />$0.00 <br />NA <br />$0.00 <br />Operator cost/hour: <br />$22.29 <br />$38.72 <br />$38.54 <br />$38.54 <br />NA <br />$38.70 <br />Unit subtotals : <br />Number of units : <br />$144.14 <br />$170.58 <br />$243.45 <br />$243.45 <br />NA <br />$122.56 <br />4 <br />2 <br />1 <br />1 <br />0 <br />1 <br />Group subtotals :1 <br />Work : $917.70 <br />Support : $486.89 <br />Maintenance : $122.56 <br />Total work team cost/hour: $1,527.14 <br />MATERIAL QUANTITIES <br />Initial Swell Loose <br />volume: 177,726 CCY factor : 1.125 volume: 199,942 LCY <br />Source of quantity take -off : Map 2.05.3 MIA, portal Face -ip vol., % of disturbance <br />Source of estimated swell factor : Caterpillar'Handbook 40th edition <br />Material purchase cost: $0.00 /LCY Total cost: $0 <br />HOURLY PRODUCTION <br />Truck Capacity: <br />Truck Payload (weight) B asis: Truck Bed (volume) Basis: <br />Descr <br />Rated payload <br />Payload capacity <br />82,000 pounds Average volume: <br />30.94 LCY Adjusted volume': <br />Final truck volume based on number of loader passes <br />truck volume adjusted to not exceed rated payload or heaped volume <br />Loading Tool Capacity: <br />Rated capacity (nom. heaped) : 8.200 LCY <br />Descr.: Blasted rock - avg. blasted (75 - 90%) <br />Bucket fill factor: 0.825 <br />Adjusted bucket capacity: 6.765 LCY <br />sheet 1 of 2 <br />LCY <br />LCY <br />LCY <br />LCY <br />LCY <br />Job Condition Corrections : Site altitude (ft.) : 6,800 <br />Truck <br />Loader <br />Source <br />Altitude adj.: <br />1.000 <br />1.000 <br />(Cat HB <br />Job efficiency: <br />0.830 J <br />0.830 <br />(1 shift/da <br />Net correction : <br />0.830 1 <br />0.830 <br />