Laserfiche WebLink
CIRCES Cost Estimatin4 Software <br />TRUCK/LOADER TEAM WORK <br />sheet 1 of 2 <br />Permit or other job action : New application <br />Task description Haul backfill mat. from utility pad area to portal face - up <br />HOURLY EQUIPMENT COST Shift basis: 1 per day <br />�Eouioment Descriotion <br />Truck/loader team -Truck : <br />-Loader: <br />Cat 769D <br />CAT 988G (2005) <br />Support equipment -Load area <br />-Dump area: <br />Cat D10R - 10SU (2005) <br />NA <br />Road maintenance -Motor grader: <br />-Water truck : <br />NA <br />Water Tanker, 10,000 Gal. <br />Cost Breakdown: <br />Truck/Loader Work Team <br />Truck I Loading Tool <br />Support Equipment <br />Load Area Dump Area <br />Road Maintenance Equipment <br />Motor Grader Water Truck <br />Import data filename : <br />truck2 <br />loader <br />dozer <br />NA <br />NA <br />misctruk <br />% Utilization-machine: <br />95 <br />100 <br />100 <br />NA <br />NA <br />25 <br />- Ripper attachment: <br />NA <br />NA <br />20 <br />NA <br />NA <br />NA <br />Ownership cost/hour : <br />$52.27 <br />$62.60 <br />$76.61 <br />NA <br />NA <br />$62.58 <br />Operating cost/hour : <br />$65.85 <br />$76.38 <br />$128.30 <br />NA <br />NA <br />$21.28 <br />Ripper op. cost/hour : <br />NA <br />NA <br />$0.00 <br />NA <br />NA <br />$0.00 <br />Operator cost/hour : <br />$22.29 <br />$38.72 <br />$38.54 <br />NA <br />NA <br />$38.70 <br />Unit subtotals : <br />Number of units : <br />$140.41 <br />$177.70 <br />$243.45 <br />NA <br />NA <br />$122.56 <br />6 <br />3 <br />1 <br />0 <br />0 <br />1 <br />Group subtotals :1 <br />Work. $1,375.58 <br />Support : $243.45 <br />Maintenance: $122.56 <br />a <br />Total work team cost/hour : $1,741.58 <br />MATERIAL QUANTITIES <br />Initial Swell Loose <br />volume: 168,910 CCY factor : 1.125 volume: 190,024 LCY <br />Source of quantity take -off : Map 2.05.3 MIA, portal F. U. Vol.. % of disturbance <br />Source of estimated swell factor Caterpillar Handbook 40th edition <br />Material purchase cost : $0.00 <br />/LCY Total cost : <br />$0 <br />HOURLY PRODUCTION <br />Truck Capacity: <br />Truck Payload (weight) Basis: <br />Truck Bed (volume) Basis: <br />Material weight: 2,650 pounds /LCY <br />Struck volume: <br />21.60 <br />LCY <br />Descr. : Decomposed rock - 25% Rock, 75% Earth <br />Heaped volume: <br />Average volume: <br />31.70 <br />26.65 <br />LCY <br />LCY <br />Rated payload : 82,000 pounds <br />Payload capacity: 30.94 LCY <br />Adjusted volume *: <br />30.94 <br />LCY <br />Final truck volume based <br />on number of loader passes : <br />27.06 <br />LCY <br />'truck volume adjusted to not exceed <br />rated payload or heaped volume <br />Loading Tool Capacity: <br />Job Condition Corrections: Site altitude (ft.) : <br />6,800 <br />Rated capacity (nom. heaped) : 8.200 LCY <br />Truck <br />Loader <br />Source <br />Descr.: Blasted rock - avg. blasted (75 - 90%) <br />Altitude adj.: 1.000 <br />1.000 <br />(Cat HB) <br />Bucket fill factor : 0.825 <br />Job efficiency: <br />0.830 <br />0.830 <br />(1 shift/day) <br />Adjusted bucket capacity: 6.765 LCY <br />Net correction : <br />0.830 <br />0.830 <br />