My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-05-07_PERMIT FILE - C2009087A (38)
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C2009087A
>
2010-05-07_PERMIT FILE - C2009087A (38)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:11:41 PM
Creation date
6/3/2010 4:41:56 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C2009087A
IBM Index Class Name
Permit File
Doc Date
5/7/2010
Doc Name
Estimated Reclamation Cost
Section_Exhibit Name
Exhibit 3.02.2-E1 Estimated Reclamation Cost
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
136
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
sheet 1 of 2 <br />CIRCES Cost Estimatina Software <br />TRUCK/LOADER TEAM WORK <br />Task # <br />Date <br />User <br />Agency or organization name Division Of Reclamation, Mining And Safety <br />052 State : Colorado Permit/job # : C2009 - 087 <br />0311612010 County : Routt Abbreviation : none <br />JHB Site Peabody Sage Creek Mine Filename : C087 -052 <br />Permit or other job action : New application <br />Task description : Haul backtill mat. from Coal Handling Facilities to portal f.u. <br />HOURLY EQUIPMENT COST Shift basis: 1 per day <br />�Eouioment Description <br />Truck/loader team -Truck : <br />-Loader <br />Cat 769D <br />CAT 988G (2005) <br />Support equipment -Load area <br />-Dump area <br />Cat D10R - 10SU (2005) <br />NA <br />Road maintenance -Motor grader: <br />-Water truck: <br />NA <br />Water Tanker, 10,000 Gal. <br />Cost Breakdown : <br />Truck/Loader Work Team <br />Truck Loading Tool <br />Support Equipment <br />Load Area Dump Area <br />Road Maintenance Equipment <br />Motor Grader Water Truck <br />Import data filename : <br />truck2 <br />loader <br />dozer <br />NA <br />NA <br />misctruk <br />% Utilization-machine: <br />90 <br />100 <br />100 <br />NA <br />NA <br />25 <br />- Ripper attachment: <br />NA <br />NA <br />20 <br />NA <br />NA <br />NA <br />Ownership cost/hour: <br />$52.27 <br />$62.60 <br />$76.61 <br />NA <br />NA <br />$62.58 <br />Operating cost/hour : <br />$62.53 <br />$76.38 <br />$128.30 <br />NA <br />NA <br />$21.28 <br />Ripper op. cost/hour : <br />NA <br />NA <br />$0.00 <br />NA <br />NA <br />$0.00 <br />Operator cost/hour: <br />$22.29 <br />$38.72 <br />$38.54 <br />NA <br />NA <br />$38.70 <br />Unit subtotals : <br />Number of units : <br />$137.10 <br />$177.70 <br />$243.45 <br />NA <br />NA <br />$122.56 <br />4 <br />2 <br />1 <br />0 <br />0 <br />1 <br />Group subtotals :1 <br />Work: $903.79 <br />Support : $243.45 <br />Maintenance : $122.56 <br />Total work team cost/hour: $1,269.79 <br />MATERIAL QUANTITIES <br />Initial Swell Loose <br />volume: 258,832 CCY factor : 1.125 volume: 291,186 LCY <br />Source of quantity take -off : Map 2.05.3 MIA, volume of face -up, % of disturbance <br />Source of estimated swell factor Caterpillar Handbook 40th edition <br />Material purchase cost: $0.00 /LCY Total cost: $0 <br />„ <br />HOURLY PRODUCTION <br />T <br />Truck Capacity: <br />Truck Payload (weight) Basis: Truck Bed (volume) Basis: <br />Material weight: <br />2,650 pounds /LCY <br />Struck volume : <br />21.60 <br />LCY <br />Descr.: Decomposed rock - 25% Rock, 75% Earth <br />Heaped volume: <br />Average volume: <br />31.70 <br />26.65 <br />LCY <br />LCY <br />Rated payload : 82,000 pounds <br />Payload capacity : <br />30.94 LCY <br />Adjusted volume': <br />30.94 <br />LCY <br />Final truck volume based <br />on number of loader passes : <br />27.06 <br />LCY <br />'truck volume adjusted to not exceed <br />rated payload or heaped volume <br />Loading Tool Capacity: <br />Job Condition Corrections: <br />Site altitude (ft.) : <br />6,800 <br />Rated capacity (nom. heaped) : <br />8.200 LCY <br />Truck <br />Loader <br />Source <br />Descr.: Blasted rock - avg. blasted (75 - 90 %) <br />Altitude adj. :1 1.000 <br />1 1.000 <br />(Cat HB) <br />Bucket fill factor : <br />0.825 <br />Job efficiency : 0.830 <br />1 0.830 <br />(1 shift/day) <br />Net correction :1 0.830 <br />1 0.830 <br />Adjusted bucket capacity : 6.765 LCY <br />
The URL can be used to link to this page
Your browser does not support the video tag.