My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-05-07_PERMIT FILE - C2009087A (38)
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C2009087A
>
2010-05-07_PERMIT FILE - C2009087A (38)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:11:41 PM
Creation date
6/3/2010 4:41:56 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C2009087A
IBM Index Class Name
Permit File
Doc Date
5/7/2010
Doc Name
Estimated Reclamation Cost
Section_Exhibit Name
Exhibit 3.02.2-E1 Estimated Reclamation Cost
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
136
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CIRCES Cost Estimating Software <br />TRUCK/LOADER TEAM W ORK <br />sheet 1 of 2 <br />PROJECT IDENTIFICATION <br />Agency or organization name Division Of Reclamation, Mining And Safety <br />Task #: 051 State : Colorado Permit/job # : C2009 -087 <br />Date : 0311112010 County : Routt Abbreviation : none <br />User: JHB Site Peabody Sage Creek Mine Filename : C087 -051 <br />Permit or other job action : New application <br />Task description : Remove footprint of coal stockpile, haul to Foldel Creek refuse pile <br />HOURLY EQUIPMENT COST �Eauio Shift basis: 1 per day <br />ment Desrrintinn <br />Truck/loader team -Truck: <br />-Loader <br />Cat 769D <br />CAT 988G (2005) <br />Support equipment -Load area : <br />-Dump area : <br />Cat D10R - 10SU (2005) <br />Cat D10R - 10SU (2005) <br />Road maintenance -Motor grader <br />-Water truck : <br />CAT 14H <br />Water Tanker, 10,000 Gal. <br />Cost Breakdown : <br />Truck/Loader Work Team <br />Truck Loading Tool <br />Support Equipment <br />Load Area Dump Area <br />Road Maintenance Equipment <br />Motor Grader Water Truck <br />Import data filename: <br />truck2 <br />loader <br />dozer <br />dozer <br />grader <br />misctruk <br />% Utilization-machine: <br />100 <br />99 <br />100 <br />100 <br />5 <br />5 <br />- Ripper attachment: <br />NA <br />NA <br />20 <br />NA <br />0 <br />NA <br />Ownership cost/hour : <br />$52.27 <br />$62.60 <br />$76.61 <br />$76.61 <br />$41.79 <br />$62.58 <br />Operating cost/hour : <br />$69.57 <br />$75.66 <br />$128.30 <br />$128.30 <br />$2.31 <br />$4.26 <br />Ripper op. cost/hour : <br />NA <br />NA <br />$0.00 <br />$0.00 <br />$0.00 <br />$0.00 <br />Operator cost/hour : <br />$22.29 <br />$38.72 <br />$38.54 <br />$38.54 <br />$24.50 <br />$38.70 <br />Unit subtotals : <br />Number of units : <br />$144.14 <br />$176.99 <br />$243.45 <br />$243.45 <br />$68.60 <br />$105.54 <br />14 <br />1 <br />1 <br />1 <br />1 <br />1 <br />Group subtotals : <br />Work: $2,194.88 <br />Support : $486.89 <br />Maintenance : $174.13 <br />Total w ork tea cost/hour : $2,855.90 <br />v <br />_ = <br />MATERIAL QUANTITIES <br />Initial Swell Loose <br />volume: 9,531 LCY factor : NA, volume <br />9.531 LCY <br />Source of quantity take -off : Map 2.05.3 M1A, area of coal handling facilities X 3 ft. th. <br />Source of estimated swell factor NA <br />Material purchase cost: $ 0.00 /LCY Total cost : $0 <br />HOURLY PRODUCTION <br />Truck Capacity: <br />Truck Payload (weight) Basis: I Truck Bed (volume) Basis: <br />Material weight: 1,600 <br />Descr.: Coal - Bituminous, Raw <br />pounds /LCY <br />Struck volume : <br />Heaped volume: <br />Average volume: <br />21.60 <br />31.70 <br />26.65 <br />LCY <br />LCY <br />LCY <br />Rated payload : 82,000 pounds <br />Payload capacity: 51.25 <br />LCY <br />Adjusted volume *: <br />31.70 <br />LCY <br />Final truck volume based <br />on number of loader passes : <br />30.34 <br />LCY <br />" truck volume adjusted to not exceed <br />rated payload or heaped volume <br />Loadina Tool Capacity: <br />Job Condition Corrections : <br />Site altitude <br />(ft.) : 6,700 <br />Rated capacity (nom. heaped) : 8.200 <br />LCY <br />Truck <br />Loader <br />Source <br />Descr. : Loose material - 118" to 3/8" (90 - <br />95%) <br />Altitude adj.: 1.000 <br />1.000 <br />(Cat HB) <br />Bucket fill factor : 0.925 <br />Job efficiency: 0.830 <br />0.830 <br />(user) <br />Adjusted bucket capacity : 7.585 <br />LCY Net correction : 0.830 <br />0.830 <br />
The URL can be used to link to this page
Your browser does not support the video tag.