Laserfiche WebLink
sheet 1 of 2 <br />CIRCES Cost Estimatina Software <br />SCRAPER TEAM WORK <br />PROJECT IDENTIFICATION <br />Task #: <br />Date : <br />User: <br />Agency or organization name Division Of Reclamation, Mining And Safety <br />042 State : Colorado Permit/job # C2009 -087 <br />0310812010 County : Routt Abbreviation : none <br />JHB Site Peabodv Saae Creek Mine Filename : C087 -042 <br />Permit or other job action : New Application <br />Task description: Replace topsoil on Haulroad C reduction <br />- <br />' <br />HOURLY EQUIPMENT COST <br />iipment Description <br />Cost Bre <br />Shift basis : 1 per day <br />Scraper work team - Scraper <br />-Push dozer <br />Support equipment -Load area <br />-Dump area <br />Road maintenance -Motor grader <br />-Water truck <br />! 637G w /push -pull <br />! D8R Series 11 - 8SU (2005) <br />T 14H <br />ter Tanker, 10,000 Gal. <br />akdown : <br />Scraper Work Team <br />Scraper Dozer <br />Support Equipment <br />Load area Dump area <br />Road Maintenance Equipment <br />Grader Water truck <br />Import data filename : <br />scraper2 <br />NA <br />NA <br />dozer <br />grader <br />misctruk <br />% Utilization-machine: <br />- Ripper attachment: <br />100 <br />NA <br />NA <br />25 <br />25 <br />25 <br />NA <br />NA <br />NA <br />0 <br />0 <br />NA <br />Ownerhip cost/hour : <br />Operating cost/hour : <br />Ripper op. cost/hour : <br />Operator cost/hour : <br />$109.89 <br />NA <br />NA <br />$46.56 <br />$41.79 <br />$62.58 <br />$163.34 <br />NA <br />NA <br />$17.66 <br />$11.56 <br />$21.28 <br />NA <br />NA <br />NA <br />$0.00 <br />$0.00 <br />$0.00 <br />$24.98 <br />NA <br />NA <br />$38.54 <br />$24.50 <br />$38.70 <br />Unit subtotals : <br />Number of units : <br />$298.21 <br />NA <br />NA <br />$102.75 <br />$77.85 <br />$122.56 <br />2 <br />0 <br />0 <br />1 <br />1 <br />1 <br />Group subtotals : <br />Work: $596.43 <br />Support: $102.75 <br />Maintenance : $200.41 <br />Total work team cost/hour : $ 8 99.59 <br />MATERIAL QUANTITIES <br />Initial <br />volume: 1,498 CCY <br />_ 'ry - <br />HM <br />Swell Loose <br />factor : 1.102 volume: 1.651 LCY <br />Source of quantity take -off : Map 2.05.3 M1A, Area x 9" th. <br />Source of estimated swell factor: Seneca // SL3 RCE <br />