My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-05-07_PERMIT FILE - C2009087A (38)
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C2009087A
>
2010-05-07_PERMIT FILE - C2009087A (38)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:11:41 PM
Creation date
6/3/2010 4:41:56 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C2009087A
IBM Index Class Name
Permit File
Doc Date
5/7/2010
Doc Name
Estimated Reclamation Cost
Section_Exhibit Name
Exhibit 3.02.2-E1 Estimated Reclamation Cost
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
136
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Agency or organization name : Division Of Reclamation, Mining And Safety <br />Permit or other job action : New application <br />Task description : Rip Haulroad B -1 Reduction <br />HOURLY EQUIPMENT COST <br />Basic machine: Cat D9R - 9SU (2005) Horsepower: 405 <br />Blade type Semi-Universal <br />Attachment no. 1 : ROPS Cab Shiftbasis: - I per day <br />Attachment no. 2:3-shank ripper <br />Data source :— (CRG) <br />Utilization % <br />Cost Breakdown Ownership cost/hour: $66.25 NA <br />Dozer operating cost/hour: $95.29 100 <br />Ripper operating cost/hour: $6.95 100 <br />Operator cost/hour: $38.54 NA <br />Total unit cost/hour: $207.03 Total fleet cost/hour: $207.03 <br />MATERIAL QUANTITIES <br />Average dozer speed : <br />88.00 <br />Selected estimating method <br />Area <br />0.25 <br />Alternate methods <br />Production per unit area : <br />0.762 <br />acres/hour <br />Seismic: NA NA <br />Load factor: <br />NA Bank volume: <br />NA <br />BCY <br />Area 1.10 acres <br />Rip depth (ft) : <br />1.00 Volume: <br />1,775 <br />BCY or CCY <br />Source of estimated quantity: <br />Map 2.05.3 MIA <br />Source of estimated load factor: <br />NA <br />HOURLY PRODUCTION <br />Alternate methods - <br />Job Condition Correction Factors - <br />Seismic : Seismic velocity: NA <br />feet/second <br />Unadjusted production <br />Unadjusted production NA <br />cu.yds./hour <br />per selected method <br />1,229.44 <br />- cu.yds./hour <br />Area Avg. ripping depth 1.00 <br />feet/pass <br />Site altitude <br />6,600 <br />Average ripping width 7.67 <br />feet/pass <br />Altitude adjustment: <br />1.00 <br />— feet <br />(Cat HB) <br />Average ripping length 100.00 <br />feet/pass <br />Job efficiency factor: <br />0.83 <br />(1 shift/day) <br />Average dozer speed : <br />88.00 <br />feet/minute <br />Average maneuver time: <br />0.25 <br />minutes/pass <br />Production per unit area : <br />0.762 <br />acres/hour <br />Unadjusted production 1,229.44 cu. yds./hour <br />JOB TIME AND COST <br />Fleet size : 1 dozer(s) <br />Net job correction <br />0.83 multiplier <br />Adjusted unit production 1,020.43 cu.yds./hour <br />Adjusted fleet production 1,020.43 cu.yds./hour <br />... ...... . <br />Total job time : 1.74 hours <br />Unit cost : $0.203 per cu. yd. Total job cost: $360 <br />__ _ _ ---------------- 7-- <br />
The URL can be used to link to this page
Your browser does not support the video tag.