Laserfiche WebLink
CIRCES Cost Estimating Software <br />BULLDOZER WORK <br />PROJECT IDENTIFICATION <br />Task # : 018 State : Colorado Permit/job# : C2009 -087 <br />Date <br />User <br />03/05/2010 <br />JHB <br />County : Routt Abbreviation : none <br />Site: Peabody Sage Creek Mine Filename : C087 -018 <br />Agency or organization name Division Of Reclamation, Mining And Safety <br />Permit or other job action : New application <br />Task description: Regrade Haulroad A -2 removal <br />HOURLY EQUIPMENT COST <br />Basic machine: Cat D9R - 9SU (2005) <br />Blade type Semi - Universal <br />Attachment no. 1 : ROPS Cab <br />Attachment no. 2 : 3-shank ripper <br />Cost Breakdown: <br />MATERIAL QUANTITIES <br />Initial <br />Horsepower: 405 <br />Shift basis : 1 per day <br />volume: 7,770 CCY <br />Swell Loose <br />factor : 1.165 volume: 9,053 LCY <br />Source of estimated volume: Map 2.05.3 MIA <br />Source of estimated swell factor Caterpillar Handbook 40th edition <br />HOURLY PRODUCTION Job Condition Correction Factors Source <br />Average push distance : 250 feet <br />Unadjusted hourly production : 546.0 LCY /hr <br />Material consistency description <br />Rock, well ripped or blasted <br />Average push gradient: 5.00 % (i <br />Average site altitude : 6,850 feet <br />Material weight: 2,900 Ibs /LCY <br />Weight description : <br />Decomposed rock - 50% Rock, 50% Earth <br />Operator skill : <br />0.75 <br />Data source : (CRG) <br />(avg.) <br />Material consistency : <br />Utilization % <br />Ownership cost/hour : <br />$67.77 <br />NA <br />Operating cost/hour : <br />$95.29 <br />100 <br />Ripper op. cost/hour : <br />$0.00 <br />0 <br />Operator cost/hour : <br />$38.54 <br />NA <br />Total unit cost/hour : <br />$201.60 <br />Total fleet cost/hour : $201.60 <br />volume: 7,770 CCY <br />Swell Loose <br />factor : 1.165 volume: 9,053 LCY <br />Source of estimated volume: Map 2.05.3 MIA <br />Source of estimated swell factor Caterpillar Handbook 40th edition <br />HOURLY PRODUCTION Job Condition Correction Factors Source <br />Average push distance : 250 feet <br />Unadjusted hourly production : 546.0 LCY /hr <br />Material consistency description <br />Rock, well ripped or blasted <br />Average push gradient: 5.00 % (i <br />Average site altitude : 6,850 feet <br />Material weight: 2,900 Ibs /LCY <br />Weight description : <br />Decomposed rock - 50% Rock, 50% Earth <br />Operator skill : <br />0.75 <br />(avg.) <br />Material consistency : <br />0.80 <br />(Cat HB) <br />Dozing method: <br />1.00 <br />(gen.) <br />Visibility: <br />1.00 <br />(avg.) <br />Job efficiency : <br />0.83 <br />(lshift/da) <br />Spoil pile: <br />0.70 <br />(fnd -mt) <br />Push gradient: <br />1.11 <br />(Cat HB) <br />Altitude : <br />1.00 <br />(Cat HB) <br />Material weight: <br />0.79 <br />(Cat HB) <br />Blade type : <br />1.00 <br />(S /SU /U) <br />Net correction : <br />0.31 <br />Adjusted unit production : <br />168.32 <br />LCY /hr <br />Adjusted fleet production : <br />168.32 <br />LCY /hr <br />