My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-05-07_PERMIT FILE - C2009087A (38)
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C2009087A
>
2010-05-07_PERMIT FILE - C2009087A (38)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:11:41 PM
Creation date
6/3/2010 4:41:56 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C2009087A
IBM Index Class Name
Permit File
Doc Date
5/7/2010
Doc Name
Estimated Reclamation Cost
Section_Exhibit Name
Exhibit 3.02.2-E1 Estimated Reclamation Cost
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
136
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
- - <br />_ <br />HOURLY PRODUCTION _ <br />r - <br />- - <br />Job Condition Corrections: <br />_ <br />sheet 2 of 2 <br />Hauling Capacity: <br />Velocity (fpm) <br />Travel time (min.)`* <br />1 <br />Scraper Payload (weight) Basis: <br />Push dozer <br />Scraper Bowl (volume) Basis: <br />Scraper loading time : 1.00 minutes <br />1867 <br />Material weight: <br />2,075 pounds /LCY <br />Struck volume : <br />24.00 <br />LCY <br />Material description : <br />Job efficiency : <br />Heaped volume: <br />34.00 <br />LCY <br />USER - PROVIDED WEIGHT DATA <br />Fleet size : 1 Team(s) Total job time : <br />Average volume: <br />29.00 <br />LCY <br />Rated payload : <br />75,000 pounds <br />Adjusted capacity : <br />29.00 <br />LCY "* <br />Payload capacity : <br />36.14 LCY <br />• *• hourly production reflects volume per scraper pair on push -pull models <br />Cycle Time: <br />Haul distance (feet) <br />Job Condition Corrections: <br />Site altitude (ft.) : <br />6,900 <br />Velocity (fpm) <br />Travel time (min.)`* <br />1 <br />Scraper <br />Push dozer <br />Source <br />Scraper loading time : 1.00 minutes <br />1867 <br />Altitude adj.: <br />1.000 <br />NA <br />(Cat HB) <br />Maneuver and spread time : 0.60 minutes <br />Adjusted multiple scraper team (fleet) hourly production : <br />Job efficiency : <br />0.830 <br />NA <br />(Cat HB) <br />* load time per scraper pair on push -pull models <br />Fleet size : 1 Team(s) Total job time : <br />Net correction : <br />a 830 <br />NA <br />$3,504 <br />Travel time: <br />Road condition description : Firm, smooth, rolling, dirtllt. surfaced, watered, maintained <br />Haul Route: <br />Seg. # <br />Haul distance (feet) <br />Grade ( %) <br />Roll. res. ( %) <br />Total res. ( %) <br />Velocity (fpm) <br />Travel time (min.)`* <br />1 <br />3,728 <br />2.00 <br />3.00 <br />5.00 <br />1867 <br />2.12 <br />scraper(s) <br />Adjusted single scraper team (unit) hourly production : <br />565.87 <br />LCY /hour <br />Adjusted multiple scraper team (fleet) hourly production : <br />565.87 <br />LCY /hour <br />_ ....__.__ <br />JOB TIME AND COST <br />Fleet size : 1 Team(s) Total job time : <br />3.89 <br />Hours <br />Unit cost: $1. /LCY Total job cost: <br />$3,504 <br />Return route : <br />Haul time: 2.12 minutes <br />*' travel time for each segment is adjusted for acceleration/deceleration. Return time: <br />1.38 <br />minutes <br />table velocities are max. attainable per total resistance shown, not average <br />Total scraper team cycle time (load + haul + maneuver and spread + return) : <br />5.10 <br />minutes <br />Unadjusted unit production /hour : 681.78 LCY /hour * ** Adjusted for job conditions : <br />565.87 <br />LCY /hour <br />Optimal number of scrapers per push dozer: NA Selected number of scrapers : <br />2 <br />scraper(s) <br />Adjusted single scraper team (unit) hourly production : <br />565.87 <br />LCY /hour <br />Adjusted multiple scraper team (fleet) hourly production : <br />565.87 <br />LCY /hour <br />_ ....__.__ <br />JOB TIME AND COST <br />Fleet size : 1 Team(s) Total job time : <br />3.89 <br />Hours <br />Unit cost: $1. /LCY Total job cost: <br />$3,504 <br />
The URL can be used to link to this page
Your browser does not support the video tag.