My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-05-07_PERMIT FILE - C2009087A (38)
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C2009087A
>
2010-05-07_PERMIT FILE - C2009087A (38)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:11:41 PM
Creation date
6/3/2010 4:41:56 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C2009087A
IBM Index Class Name
Permit File
Doc Date
5/7/2010
Doc Name
Estimated Reclamation Cost
Section_Exhibit Name
Exhibit 3.02.2-E1 Estimated Reclamation Cost
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
136
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CIRCES Cost Estimating Software <br />BULLDOZER WORK <br />PROJECT IDENTIFICATION <br />Task # : 012 State : Colorado Permit/job# : C2009 -087 <br />Date : 0310512010 County : Routt Abbreviation : none <br />User: JHB Site Peabody Sage Creek Mine Filename : C087 -012 <br />Agency or organization name Division Of Reclamation, Mining And Safety <br />Permit or other job action : New application <br />Task description : Regrade Haulroad A -1 reduction <br />HOURLY EQUIPMENT COST <br />Basic machine Cat D9R - 9SU (2005) Horsepower: 405 <br />Blade type Semi - Universal <br />Attachment no. 1 : ROPS Cab Shift basis : 1 per day <br />Attachment no. 2 : -shank ripper <br />Data source : (CRG) <br />Cost Breakdown: Ownership cost/hour <br />Operating cost/hour <br />Ripper op. cost/hour <br />Operator cost/hour <br />Total unit cost/hour <br />Utilization % <br />MATERIAL QUANTITIES <br />_...._.._. <br />Initial <br />Swell <br />Loose <br />volume : 5,902 CCY <br />factor : 1.165 <br />volume : <br />6,876 <br />LCY <br />Source of estimated volume: Map 2.05.3 M1A <br />Source of estimated swell factor: Seneca 11 SL3 app. <br />HOURLY PRODUCTION <br />Job Condition Correction Factors <br />Source <br />Operator skill : <br />0.75 <br />(avg.) <br />Average push distance : 250 <br />feet <br />Material consistency: <br />0.80 <br />(C at HB) <br />Unadjusted hourly production : 546.0 <br />LCY /hr <br />Dozing method: <br />1.00 <br />(gen.) <br />Visibility: <br />1.00 <br />(avg.) <br />Material consistency description : <br />Job efficiency: <br />0.83 <br />(1 shift/day) <br />Rock, well ripped or blasted <br />Spoil pile: <br />0.70 <br />(fnd -mo <br />Push gradient: <br />1.00 <br />(Cat HB) <br />Average push gradient : 0.00 <br />% (pos) <br />Altitude : <br />1.00 <br />(Cat HB) <br />Average site altitude : 6,900 <br />feet <br />Material weight: <br />0.79 <br />(Cat HB) <br />Blade type : <br />1.00 <br />(S /SU /U) <br />Material weight: 2,900 <br />Ibs /LCY <br />Net correction : <br />0.28 <br />Weight description : <br />Decomposed rock - 50% Rock, 50% Earth <br />Adjusted unit production : 150.90 LCY /hr <br />Adjusted fleet production : 150.90 LCY /hr <br />JOB TIME AND COST <br />Fleet size : 1 Dozer(s) Total job time: 45.57 Hours <br />Unit cost: $1.336 /LCY Total job cost : $ 9,186 <br />
The URL can be used to link to this page
Your browser does not support the video tag.