Laserfiche WebLink
POND DIMENSTIONS <br />The dimensions and capacity of permanent stock ponds are shown on the attached stock pond as -built <br />draMn,s. As shuNrn, all embankments are loss than Ghe (5) fCUt ill IlQi"lit cw 111�d-ui�J 11011 tli'� <br />upstream toe of the dam to the invert of the emergency spillway. The combined slope of all the <br />embankments is less than 5H: IV with no slopes greater than 2H: IV. All the capacities are less than <br />two (2) acre -feet. All stock ponds have emergency spillways that consist of a single open channel. <br />None of their have a principal spillway or dewaterins pipe. <br />SPILLWAY CAPACITIES <br />The stock ponds were analyzed to determine if the spillways for the permanent stock ponds have the <br />capacity to safely pass the peak discharge from the 25 -year, 24 -hour storm event. In addition, rock <br />riprap requirements were also evaluated. <br />The peak discharge, spillway capacity and rock riprap requirements were determined using <br />SEDCAD4. The peak discharge was determined using the same methodologies and assumptions <br />outlined in the postmine channel SEDCAD demonstrations. A curve number of 71 was used for <br />this evaluation which represents a hydrologic soil group B with a fair herbaceous cover. All hydrology <br />inputs and results are shown on the attached SEDCAD4 computer printouts. <br />To determine spillway capacity, capacity tables were developed based on the existing spillway <br />dimensions using the pond subroutine in the SEDCAD model. The SEDCAD results are attached. <br />Using these tables and the peak flow from the 25 -year, 24 -hour sturm event, the depth ul tluw alld <br />freeboard were determined for each stock pond. The results, are shown on the table below. <br />Rock riprap requirements were determined using either the PADER or OSM method found in the <br />channel utility subroutine of the SEDCAD model. The results are summarized on the following <br />table. <br />s <br />STOCK POND SPILLWAY SUMMARY <br />Pond <br />25 <br />Year <br />Flow <br />cfs <br />Bottom <br />Width <br />(ft) <br />Invert <br />Elev. of <br />Spillway <br />ft <br />Depth <br />of <br />Flow. <br />ft <br />Peak <br />Flow <br />Elev. <br />ft <br />Top of <br />Embankment <br />(ft) <br />Freeboard <br />(ft) <br />Riprap <br />Dso <br />(inches) <br />T -3 <br />14.3 <br />12 <br />7,460.5 <br />0.6 <br />7,461.1 <br />7,464.0 <br />2.9 <br />Ve <br />T -4 <br />17.4 <br />6 <br />7,096.0 <br />1.1 <br />7,097.1 <br />7,102.1 <br />5.0 <br />12 <br />T -8 <br />13.5 <br />8 <br />7,318.5 <br />0.7 <br />7,319.2 <br />7,321.6 <br />2.4 <br />6 <br />T -16 <br />6.0 <br />10 <br />7,464.6 <br />0.5 <br />7,465.1 <br />7,469.0 <br />3.9 <br />6 <br />T- 17 <br />12.5 <br />20 <br />7,135.0 <br />0.4 <br />7,135.4 <br />7,138.0 <br />2.6 <br />9 <br />T -20 <br />6.4 <br />20 <br />7,202.0 <br />0.4 <br />7,202.4 <br />7,204.3 <br />1.9 <br />6 <br />T -26 <br />32.2 <br />18 <br />7.333.3 <br />0.9 <br />7.334.2 <br />7 <br />7,505.0 <br />2.2 <br />1.6 <br />9 <br />9 <br />T -28 <br />24.4 <br />20 <br />7,502.6 <br />0.8 <br />7,503.4. <br />T -29 <br />30.9 <br />18 <br />7,403.8 <br />0.9 <br />7,404.7 <br />7,406.0 <br />1.3 <br />12 <br />18 <br />7,674.0 <br />0.7 <br />7,674.7 <br />7,675.8 <br />1.1 <br />9 <br />.9 <br />15 <br />7,818.0 <br />0.8 <br />7,818.8 <br />7,820.3 <br />1.5 <br />6 <br />g1 T-3019.0 <br />.3 <br />12 <br />7,812.5 <br />0.5 <br />7,813.0 <br />7,814.8 <br />1.8 <br />6 <br />0.3 <br />17 <br />7,512.0 1 <br />0.8 <br />7,512.8 <br />7,513.8 <br />1.0 <br />9 <br />'I R --t6 <br />Revised 09"08 <br />