My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-05-07_PERMIT FILE - C2009087 (45)
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C2009087
>
2010-05-07_PERMIT FILE - C2009087 (45)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:11:38 PM
Creation date
6/3/2010 4:40:33 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C2009087
IBM Index Class Name
Permit File
Doc Date
5/7/2010
Doc Name
Turf Reinforcement Mat Design & Installation Information
Section_Exhibit Name
Exhibit 2.05.3-E2 Appendix 2.05.3-E2.G Attachment 2.05.3-E2.G-3
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
39
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br />high flow channel �, µ <br />3 -4 pins per sq. yd. STAXEAT9' -5' <br />( ISM) tNTERVALS <br />low flow channel "'� ,tt`_ >' <br />2 -3 pins per sq. yd. <br />Always install two rows of pins <br />spaced 1.5 x 1.5 feet apart at all <br />roll splice locations. <br />4. Anchoring Devices: Typically 11 -8 , c,Enc5LOTAT2 jz6)tN TERYALS <br />\��'� (OR DOUBLE ROW OF PINS) <br />gauge of a 6" x V x 6' metal pins are / f i <br />used. When surface soil conditions are �4�v <br />n n n 10 " <br />loose, use 8 x 1 x 8 or 12 x 1.5 x 12 " <br />metal pins, 8" - 18" pins with 1.5" diameter washer, or 12 -30" J -Shape pins (bent rebar) having a <br />%" diameter. Drive pins or pins flush with the ground surface. <br />5. Soil Filling: There are two options when installing Enkamat -soil filling or non -soil filling. Soil filling <br />Enkamat accelerates performance because the Enkamat, soil and the new vegetation interact <br />together to resist shear forces when water is flowing though the channel or on top of a slope. If soif <br />filling is utilized spread'/ to 3 / inches of fine soil into the mat to completely fill it. <br />A typical condition where non -soil filling is used would be to collect sediment when water is flowing <br />through the channel from an up- gradient source. <br />6. Seeding: For non -soil fillingapplications, broadcast seed or hydroseed over the installed Enkamat. <br />Make sure hydromulch occurs after seeding to ensure the seed reaches the topsoil. if soil filling, <br />seed after filling is completed. You may also seed before and after soil filling to create a better <br />established root structure and increase vegetation strength. Check with your local seeding <br />consultant to verify appropriate seed and fertilizer mixture. <br />7. Sod Installation: if covering Enkamat with sod, soil filling is required. Place sod in the direction of <br />water flow. Periodically install a row or two perpendicular to the flow to reduce the possibility of <br />water flowing along the seams of the sod. In most cases, you should pin the sod down to prevent <br />movement. <br />For technical assistance please contact your distributor or Colbond, Inc., P.O. Box 1057 Enka, NC 28728 <br />Toll Free: 800 - 365 -7391; email: enka - engineered @colbond.com, web:www.colbond- usa.com <br />a Colbond Geosynthetics R:11/01 Printed in the USA <br />• <br />
The URL can be used to link to this page
Your browser does not support the video tag.