Laserfiche WebLink
ADJUSTED COSTS <br />Ownership Costs <br /> <br /> <br />Depreciation CFC Overhead <br />Overhaul and <br />and Ope <br />Overhaul Field Repair <br />Labor Parts Labor Parts <br />Acquisition cost : $18 <br />34 <br /> <br />Econ.life -Dozer and ROPS : . <br />$18 <br />34 NA NA NA NA NA NA <br /> . NA NA $7.89 $14.63 $8.77 $13.86 <br />Attachment no. 2 : NA NA NA $1.32 $1.35 $2.41 $1.36 <br />Annual usage : $27.67 $13.26 $12.81 NA NA NA NA <br />Double shifts : $20.75 $6.63 $6.40 NA NA NA NA <br />Triple shifts : $18.46 $4.42 $4.26 NA NA NA NA <br />Mechanic labor-Dozer and ROPS : NA NA NA $4.61 NA $5.12 NA <br />-Attachment no. 2: NA NA NA $0.77 NA $1.41 NA <br />Fuel/lube -Dozer and ROPS : NA NA NA NA NA NA NA <br />Attachment no. 2:1 NA NA NA NA NA NA NA <br />COST SUBTOTALS <br />ROPS and Attachment no. 2: <br />Single shifts <br />Double shifts <br />Triple shifts <br /> ......... <br />.::::.. <br />Ownership Costs <br />Depreciation I CFC <br /> <br /> <br />$27.67 $13.26 <br />$20.75 $6.63 <br />$18.46 $4.42 <br />rating Costs <br />Fuel <br />NA <br />NA <br />NA <br />NA <br />NA <br />NA <br />NA <br />NA <br />$24.99 <br />$0.00 <br />sheet 2 of 2 <br />Lube Tires G.E.C. <br />NA NA NA <br />NA NA NA <br />NA NA NA <br />NA NA NA <br />NA NA NA <br />NA NA NA <br />NA NA NA <br />NA NA NA <br />$5.41 $0.00 $2.01 <br />$0.35 $0.00 $1.13 <br />Lube Tires G.E.C. <br /> <br />$5.41 $0.00 $2.01 <br />$0.35 $0.00 $1.13 <br /> <br /> <br />HOURLY OPERATOR WAGES <br />_ <br />Base <br /> <br />Fringe <br /> <br />F I C.A. <br /> <br />Unempl. .. <br /> <br />c <br /> <br />' <br />Total <br />; <br /> Rate Benefits 7.65% 6.20% ($/hr) Shift Differential Colorado labor zone : 2 <br />Dozer operator (< 70hp $23 <br />67 $9 <br />22 <br /> <br />Dozer operator (-70hp) . <br />$23 <br />67 . $1.81 $1.47 a $38.54 Day : $0.00 Two shift per day average : $0.15 <br /> <br /> <br />Mechani . <br /> <br />$16 <br />74 $9.22 <br /> <br />$4 <br />20 $1.81 $1.47 $38.54 Swing : $0.30 Three shi <br />ft per darage : <br />$0.25 <br /> . . $1.28 $1.04 $24.93 Night : $0.45 <br />. <br />HOURLY EQUIPMENT COST SUMMARY .. <br />Ownership <br />Operating and Overhaul <br />Machine Attachments <br />Operator <br />Total <br />Cost/hr ($) <br />Single shifts : $53.74 $70.63 $6.37 $38.54 $169.27 <br />Double shifts : $33.79 $70.63 $6.37 $38.69 $149.47 <br />Triple shifts:, $27.14 $70.63 $6.37 $38.79 $142.92 <br />PERFORMANCE DATA <br />Description Horse ower <br />(FHP) Transmission <br />Type Weight <br />(UST) Length <br />(ft) Width <br />(ft) Height <br />(ft) Fuel <br />type <br />Dozer : Cat DBR Series 11- 8U (20 310 NA 41.8 22.8 8.7 11.5 diesel <br />Blade: Universal NA NA 6.0 NA 14.0 5.7 NA <br />Attachment no. 1 : ROPS Cab NA NA NA NA NA NA NA <br />Attachment no. 2:1 3-shank ripper NA NA 5.4 3.6 7.1 2.6 NA <br />Total weight : L__53.2 (UST) <br />Adj. <br />Ripper <br />type <br />NA <br />NA <br />NA