Laserfiche WebLink
ROADABLE EQUIPMENT sheet 2 of 2 <br />Machine <br />Description Total <br />Cost/hour/unit Fleet Size <br />(No. units) Haul Trip <br />Cost/hr/fleet Return Trip <br />Cost/hr/fleet <br /> <br />-Flatbed Truck, 4x2, 30K GVW $46.28 1 $46.28 $46.28 <br /> <br />-Light Duty Pickup, 4x4, 314 T. $50.15 1 $50.15 $50.15 <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />Subtotals : $96.43 $96.43 <br />............ ..............:::.:. . <br />EQUIPMENT HAUL DISTANCE and TIME <br />Nearest major city or town within project area region <br />Transportation Cycle Time : Non- Total one-way travel distance <br />Roadable Roadable Average travel speed <br />Eauipment Equipment <br />Haul time (hours) _ <br />Return time (hours) _ <br />Loading time (hours) _ <br />Unloading time (hours) _ <br />Subtotals = <br />0.33 0.33 Total non-roadable mob/demob cost * : <br />0.33 0.33 * two round trips with haul rig <br />0.50 NA Total roadable mob/demob cost ** <br />0.50 NA ** one round trip, no haul rig <br />1.67 0.67 <br />Dolores <br />10.0 miles <br />30.0 mph <br />$2,351.20 <br />$64.29 <br />JOB TIME AND COST Total job time : 3.33 hours <br />Total job cost $2415