Laserfiche WebLink
Data source : (CRG) <br /> Utilization % <br />Cost Breakdown : Ownership cost/hour : $53.74 NA <br /> Operating cost/hour : $70.63 100 <br /> Ripper op. cost/hour : $0.64 10 <br /> Operator cost/hour : $38.54 NA <br /> Total unit cost/hour : $163.54 Total fleet cost/hour : <br />........... $163.54 <br />... ...... <br />MATERIAL QUANTITIES ...................: .. . . <br />Initial Swell Loose <br />volume : 2,436 LCY factor : NA volume : 2436 LCY <br /> <br />Source of estimate d volume : See attached drawing, "Highwall Reduction" <br />Source of estimated swell factor :NA <br /> <br /> <br />HOURLY PRODUCTION ..... ......... .:. <br />Job Condition Correction Factors <br />Source <br /> Operator skill : 0.75 (avg.) <br />Average push distance : 50 feet Material consistency : 0.90 (Cat HB) <br />Unadjusted hourly production : 1,627.0 LCY/hr Dozing method : 1.00 (gen.) <br /> Visibility : 1.00 (avg.) <br />Material consistency description : Job efficiency : 0.83 (1shift/day) <br />Compacted fill or embankment Spoil pile : 0.80 (fnd-rf) <br /> Push gradient : 1.22 (Cat HB) <br />Average push gradient : 10.00 % (neg) Altitude : 1.00 (Cat HB) <br />Average site altitude : 6,800 feet Material weight : 0.70 (Cat HB) <br /> Blade type : 1.00 (S/SU/U) <br />Material weight : 3,300 Ibs/LCY Net correction : 0.38 <br />Weight description : <br />Decomposed rock - 75% Rock, 25% Earth Adjusted unit production : 622.60 LCY/hr <br /> Adjusted fleet production : 622.60 LCY/hr <br /> <br /> <br />JOB TIME AND COST .:: _. . <br />Fleet size : 1 Dozer(s) Total job time : 3.91 Hours <br />Unit cost : $0.263 /LCY Total job cost : $640 <br />