My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-05-31_INSPECTION - M2008010
DRMS
>
Day Forward
>
Inspection
>
Minerals
>
M2008010
>
2010-05-31_INSPECTION - M2008010
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:12:32 PM
Creation date
6/3/2010 2:29:12 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2008010
IBM Index Class Name
INSPECTION
Doc Date
5/31/2010
Doc Name
Inspection report
From
DRMS
To
Stone Sand & Gravel LLC
Inspection Date
4/13/2010
Email Name
WHE
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Data source : (CRG) <br /> Utilization % <br />Cost Breakdown : Ownership cost/hour : $53.74 NA <br /> Operating cost/hour : $70.63 100 <br /> Ripper op. cost/hour : $0.64 10 <br /> Operator cost/hour : $38.54 NA <br /> Total unit cost/hour : $163.54 Total fleet cost/hour : <br />........... $163.54 <br />... ...... <br />MATERIAL QUANTITIES ...................: .. . . <br />Initial Swell Loose <br />volume : 2,436 LCY factor : NA volume : 2436 LCY <br /> <br />Source of estimate d volume : See attached drawing, "Highwall Reduction" <br />Source of estimated swell factor :NA <br /> <br /> <br />HOURLY PRODUCTION ..... ......... .:. <br />Job Condition Correction Factors <br />Source <br /> Operator skill : 0.75 (avg.) <br />Average push distance : 50 feet Material consistency : 0.90 (Cat HB) <br />Unadjusted hourly production : 1,627.0 LCY/hr Dozing method : 1.00 (gen.) <br /> Visibility : 1.00 (avg.) <br />Material consistency description : Job efficiency : 0.83 (1shift/day) <br />Compacted fill or embankment Spoil pile : 0.80 (fnd-rf) <br /> Push gradient : 1.22 (Cat HB) <br />Average push gradient : 10.00 % (neg) Altitude : 1.00 (Cat HB) <br />Average site altitude : 6,800 feet Material weight : 0.70 (Cat HB) <br /> Blade type : 1.00 (S/SU/U) <br />Material weight : 3,300 Ibs/LCY Net correction : 0.38 <br />Weight description : <br />Decomposed rock - 75% Rock, 25% Earth Adjusted unit production : 622.60 LCY/hr <br /> Adjusted fleet production : 622.60 LCY/hr <br /> <br /> <br />JOB TIME AND COST .:: _. . <br />Fleet size : 1 Dozer(s) Total job time : 3.91 Hours <br />Unit cost : $0.263 /LCY Total job cost : $640 <br />
The URL can be used to link to this page
Your browser does not support the video tag.