My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-05-31_INSPECTION - M2008010
DRMS
>
Day Forward
>
Inspection
>
Minerals
>
M2008010
>
2010-05-31_INSPECTION - M2008010
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:12:32 PM
Creation date
6/3/2010 2:29:12 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2008010
IBM Index Class Name
INSPECTION
Doc Date
5/31/2010
Doc Name
Inspection report
From
DRMS
To
Stone Sand & Gravel LLC
Inspection Date
4/13/2010
Email Name
WHE
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ADJUSTED COSTS <br />Ownership Costs <br /> <br />Depreciation CFC Overhead <br />Overhaul and Operating Costs sheet 2 of 2 <br />Overhaul Field Repair <br />Labor Parts Labor Parts Fuel Lube Tires G <br />E <br />C <br /> <br />Acquisition cost : <br />$18.34 <br />NA <br />NA <br />NA <br />NA <br />NA <br />NA <br />NA <br />NA <br />NA . <br />. <br />. <br />NA <br />Eoon.life -Dozer and ROPS : <br />-Attachment no. 2: $18.34 <br />NA NA <br />NA NA <br />NA <br />$1.32 $14.63 <br />$1.35 $8.77 <br />$2.41 $13.86 <br />$1.36 NA <br />NA NA <br />NA NA <br />NA NA <br />NA <br />Annual usage : $27.67 $13.26 $12.81 NA NA NA NA NA NA NA NA <br />Double shifts : $20.75 $6.63 $6.40 NA NA NA NA NA NA NA NA <br />Triple shifts : <br />Mechanic labor-Dozer and ROPS $18.46 <br />N $4.42 $4.26 NA NA NA NA NA NA NA NA <br />: A NA NA $4.61 NA $5.12 NA NA NA NA NA <br />-Attachment no. 2 : NA NA NA $0.77 NA $1.41 NA NA NA NA NA <br />Fuel/tube -Dozer and ROPS : NA NA NA NA NA NA NA $24.99 $5.41 $0.00 $2.01 <br />Attachment no. 2 NA NA NA NA NA NA NA $0.00 $0.35 $0.00 $1.13 <br /> <br />ADJUSTED COST SUBTOTALS <br />Ownership Costs _ <br />Overhaul and Operating Costs <br /> Overhaul Field Repair <br /> Depreciation CFC Overhead Labor Parts Labor Parts Fuel Lube Tires G <br />E <br />C <br /> <br />Dozer, ROPS and Attachment no. 2 : <br />Dozer and ROPS : . <br />. <br />. <br />Single shifts : $27.67 $13.26 $12.81 $4.61 $14.63 $5.12 $13.86 $24.99 $5.41 <br />$0.00 $2.01 <br />Double shifts : $20.75 $6.63 $6.40 Attachment no. 2: <br />Triple shifts : $18.46 $4.42 $4.26 $0.77 $1.35 $1.41 $1.36 $0.00 $0.35 $0.00 $1.13 <br />HOURLY OPERATOR WAGES Base Fringe F.I.C.A. Unempl. Wk.Comp. Total <br /> Rate Benefits 7.65% 6.20% 10.00% ($/hr) Shift Differential Colorado labor zone : 2 <br />Dozer operator (< 70hp <br />Dozer operator (>=70hp $23.67 <br />$23.67 $9.22 <br />$9.22 $1.81 <br />$1.81 $1.47 <br />$1.47 $2.37 <br />$2.37 $38.54 <br />$38.54 Day : <br />Swing : $0.00 <br />$0.30 Two shift.per day average : <br />Three shift per day average : $0.15 <br />$0.25 <br />Mechanic $16.74 $4.20 $1.28 $1.04 $1.67 $24.93 Night : $0.45 <br /> <br />HOURLY EQUIPMENT COST SUMMARY <br />Ownership .. .. <br />Operating and Overhaul <br />Machine Attachments <br />Operator <br />Total <br />Cost/hr ($) <br />Single shifts : $53.74 $70.63 $6.37 $38.54 $169.27 <br />Double shifts : $33.79 $70.63 $6.37 $38.69 $149.47 <br />Triple shifts : $27.14 $70.63 $6.37 <br />$38.79 <br />$142.92 <br /> <br />EQUIPMENT PERFORMANCE DATA <br /> <br />Description <br />Horsepower <br />(FHP) <br />Transmission <br />Type <br />Weight <br />(UST) ,:. <br />Length <br />(ft) <br />Width <br />(ft) <br />Fuel <br />type <br />Ripper <br />type <br />Dozer : Cat D8R Series 11- 8U (20 310 NA 41.8 22.8 8.7 T diesel NA <br />Blade : Universal NA NA 6.0 NA 14.0 NA NA <br />Attachment no. 1 : BOPS Cab NA NA NA NA NA NA NA <br />Attachment no. 2:1 3-shank ripper NA NA 5.4 3.6 7.1 2.6 NA Adj. Parallelogram <br />X X.:
The URL can be used to link to this page
Your browser does not support the video tag.