Laserfiche WebLink
TABLE OF CONTENTS <br />• <br />Section <br />page <br />1.0 <br />Introduction <br />2.05.3-E2.131 <br />2.0 <br />Embankment <br />2.05.3 -E2.D2 <br />3.0 <br />2005 As -Built Analysis <br />2.05.3 -E2.D2 <br />4.0 <br />SEDCAD Demonstration <br />2.05.3 -E2.D2 <br />5.0 <br />Summary <br />2.05.3 -E2.D5 <br />6.0 <br />Certification Statement <br />2.05.3 -E2.D5 <br />LIST OF ADDENDUM <br />Addendum 2.05.3- E2.D -1 — 10 -Year, 24 -Hour SEDCAD Demonstration <br />Addendum 2.05.3- E2.D -2 — 100 -Year, 24 -Hour SEDCAD Demonstration <br />Addendum 2.05.3- E2.D -3 — Emergency Spillway Channel Design <br />LIST OF ATTACHMENTS <br />Attachment 2.05.3- E2.D -1 Permanent Impoundment PECOCO (from Appendix 7 -6g, dated <br />03/02/90, of the Seneca II Mine Permit) <br />Attachment 2.05.3- E2.D -2— As -Built Report PECOCO Impoundment (from Appendix 7 -6g.1, dated <br />10105, of the Seneca II Mine Permit) <br />2.05.3- E2.D -i <br />12/09 <br />