Laserfiche WebLink
r � <br />LJ <br />TABLE OF CONTENTS <br />Section page <br />1.0 Introduction 2.05.3 -E2.A1 <br />1.0 Embankment and Excavation 2.05.3 -E2.A2 <br />3.0 Design Analysis 2.05.3 -E2.A2 <br />4.0 SEDCAD Demonstration 2.05.3 -E2.A2 <br />5.0 Summary 2.05.3 -E2.A5 <br />6.0 Certification Statement 2.05.3 -E2.A5 <br />LIST OF ADDENDUM <br />Addendum 2.05.3- E2.A -1 — 10 -Year, 24 -Hour SEDCAD Demonstration <br />Addendum 2.05.3- E2.A -2 — 25 -Year, 24 -Hour SEDCAD Demonstration <br />Addendum 2.05.3- E2.A -3 — Emergency Spillway Channel Design <br />LIST OF ATTACHMENTS <br />Attachment 2.05.3- E2.A -1 Sediment Pond No. 002, Permanent Wadge Impoundment (from <br />Appendix 7 -6a, dated 12/10/92, of the Seneca H Mine Permit) <br />Attachment 2.05.3- E2.A -2— As -Built Report Sediment Pond 002 (from Appendix 7 -6a.1, dated <br />04/05, of the Seneca H Mine Permit) <br />2.05.3- E2.A -i <br />12/09 <br />