Laserfiche WebLink
Peabody Sage Creek Mine — Drainage and Sediment Control Plan <br />• <br />• <br />• <br />the South Surface Facilities and Portal Area. Operations runoff ditch and culvert designs for both <br />facilities areas are found in Appendix 2.05.3 -E2.G, Operational Ditch and Culvert Designs. <br />1.2 Postmine Drainage Control <br />The postmine drainage control plan is shown on Map 2.05.4 MI, Postmine Topography. Most of the <br />postmine drainage channels are existing channels originally constructed as part of the reclamation <br />activities for the closed and reclaimed Seneca II Maine — the channels generally collect surface runoff <br />from closed and reclaimed operations areas and route the surface runoff to the existing ponds. <br />With the exception of PL -1, CDRMS has approved all of the drainage channels in the Pond 002 <br />watershed east of Road "A ", the upper portion of Road "Al" and Road "E" in the closed and <br />reclaimed Seneca II mining area as permanent, postmine channels. There are also several existing <br />Seneca II Mine channels south of the South Surface Facilities Area that also are approved as <br />permanent, postmine channels. Existing channels PM -1 and PM -15 have been redesigned for the <br />Peabody Sage Creek Mine operations. There are several existing road ditches from the historic <br />Seneca II operations that are included in the postmine drainage network but have not yet been <br />approved as permanent, postmine structures. All of the channels in the Pond 004 watershed have <br />been approved by CDRMS as permanent, postmine channels. There are no approved postmine <br />channels in the Pond 003 watershed. <br />The following list presents the existing Seneca II mine channels in the Peabody Sage Creek Mine <br />permit area that are approved by CDRMS as permanent, postmine channels: <br />• SII PM -1 <br />• SII PM -2 <br />• SII PM -3 <br />• SII PM -4 <br />• SII PM -5 <br />• SII PM -6 <br />• SII PM -6a <br />• SII PM -6b <br />• SII PNI -7 <br />• SII PIV1-9 <br />• SII PTV[ -10 <br />• SII PM -11 <br />• SII PTV[ -12 <br />• SII PNI -14 <br />• SII PM -15 <br />• SII PM -16 <br />• SII PM -17 <br />• SII PM -18 <br />• SII PM -19 <br />• SII PM -20 <br />• SII PM -21 <br />• SII PM -22 <br />• SII PM -23 <br />In addition to the permanent channels the following culverts and stock ponds, approved by CDRMS <br />as permanent drainage structures under the Seneca II Mine permit, are in the Peabody Sage Creek <br />Mine permit area and will be utilized as part of the postmine drainage control plan: <br />Culverts <br />• Al <br />• <br />T17 <br />• 2A <br />• A3 <br />• <br />T20 <br />• 2AA <br />• A4 <br />• <br />T26 <br />• 29A <br />• A5 <br />• <br />T28 <br />• 30A <br />• <br />T29 <br />• 32A <br />Stock Pon <br />• <br />T30 <br />• 33A <br />• T3 <br />• <br />T31 <br />• 45A <br />• T4 <br />• <br />T32 <br />• 47A <br />• T8 <br />• <br />T33 <br />• 62A <br />• T16 <br />2.05.3 -E2.4 <br />