Laserfiche WebLink
2010 Annual Report <br />Grisenti Farms Pit <br />M-2001-005 <br />Continental Materials (Castle Concrete Company) <br />Anniversary Date: May 27 <br />Overview of Permit Year: During the 2009/2010 operating year there was activity at the pit and mining did <br />take place however it was at a reduced volume base on economic conditions. During the period encompassing <br />the first five months of the 2010 year, very limited production took place. The west side mining was completed <br />and the pit has been back-sloped and seeded on approximately 80% of the area. Sales of material have been <br />almost entirely out of existing stockpiles. <br />Annual Report Map: Affected land is illustrated on the attached map and a total of 57.5 acres had been <br />affected. <br />Reclamation: Reclamation work progressed at the west pit with back-sloping and seeding taking place on <br />approximately 80% of the pit This will be completed in 2010. <br />Work Anticipated in 2010/2011: It is anticipated that this pit will see very limited production in the coming <br />year based on current economic conditions. The Pueblo and Colorado Springs operations in all likelihood will <br />be able to keep up with current demand. The remaining back-sloping will be completed in 2010 and only <br />processing of cobble material is likely to take place. Weed control will continue within the permit area. <br />Bonding: This operation is covered under a financial warranty corporate surety arrangement provided by <br />Westchester Fire Insurance Company.. <br />Continental Materials 2009-2010 Annual Report M-2001-005 Grisenti Farms Pit Page 1 of 1