Laserfiche WebLink
QF <br />Table No. 3 r= V gat <br />R.M. Hiner Construction Co., Inc. <br />Greeley Pit (M-1977-151) r4"-'CXr0UP, Inc. <br />Water Balance Date Revised: 5/21/2010 <br />AG Job #: 08-127 <br />- - <br /> <br />. ...:_ ...:.:-:_..,..: ?.. - <br /> <br />Air ? <br /> <br />w. <br />u <br />) eni n.. <br /> <br /> <br /> <br />3 <br />="D.i?Clr <br />? <br />?. <br /> <br /> <br /> <br />;!Gr i <br /> <br />-rI <br /> <br /> <br /> <br />n <br /> <br /> <br /> <br /> <br />M1f. Ski? at;` <br /> <br /> <br /> <br /> <br /> <br />? <br />e <br />1 <br /> <br />- <br />D. <br /> <br /> <br /> <br /> <br /> <br />vitiv'e . <br />Apr-10 - - - - - <br />May-10 8.71 8.80 0.00 0.00 0.09 <br />Jun-10 12.21 12.30 0.00 0.00 0.09 <br />Jul-10 13.41 13.50 0.00 0.00 0.09 <br />Aug-10 12.38 12.50 0.00 0.00 0.12 <br />Sep-10 8.72 8.80 0.00 0.00 0.08 <br />Oct 10 5.69 5.80 0.00 0.00 0.11 <br />Nov-10 2.91 0.00 3.50 3.27 0.36 <br />Dec-10 0.00 0.00 0.00 0.00 0.00 <br />Jan-11 0.00 0.00 0.00 0.00 0.00 <br />Feb-11 3.05 0.00 3.50 3.27 0.22 <br />Mar-11 4.06 0.00 4.50 4.20 0.14 <br />Total 71.12 61.70 11.50 10.74 1.31 <br />River Transit Loss = 0.25% per mile <br />Platte River Lease Transit Distance = 26.6 miles <br />Platte River Lease Transit Loss = 6.65% <br />Notes: <br />(A) Augmentation Requirement equal to Evap CU (Table 1) plus Operation CU (Table 2) <br />(8) Graham Ditch Company lease during period May through October. Due to location, no transit loss assesed <br />(C) Platte River Power Authority lease during the period November through March. Due to location, transit losses are assesed <br />(D) Platte River Lease Credit = (C) • (1- Platte River Lease Transit Loss) <br />(E) Net Affect to River = (8) f (D) - (A). Month of April not included because this month has already passed. <br />N:\09131 Rex Hiner-Greeley Pit SWSP\Dlsciplines (Technical)\WRPM\Water Rights\SWSP\2010 SWSP\Greeley Pit <br />2010 SWSP.xisx