My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-05-26_REVISION - M1999058 (4)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1999058
>
2010-05-26_REVISION - M1999058 (4)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 2:22:44 PM
Creation date
6/2/2010 8:59:19 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1999058
IBM Index Class Name
REVISION
Doc Date
5/26/2010
Doc Name
Comments/objections on amended application
From
McIntyre Law Office
To
DRMS
Type & Sequence
AM1
Violation No.
MV-2009-023
Email Name
GRM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
27
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
violation occurs. Here, the Board may impose a penalty based on 46 days of violation (from <br />the inspection date of May 26, 2009 to the August 12, 2009 hearing date) at $100 to $1,000 <br />per day for a civil penalty of $4.600 to $46,000. <br />ORDER <br />Based op the foregoing findings of fact and conclu5iQns of law, the Board l?Q?bY <br />finds that the Operator violated § 34-32.5-116(4)(h), C.R.S., for failing to minimize <br />disturbances to the prevailing hydrologic balance of the affected land and the surrounding <br />area during the mining operudon. The Board hereby issues a Cease and Desist Order <br />prohibiting any further activities at the site that would fivther damage the prevailing <br />hydrologic balance; the deposition of marble fines at the surface is spccif cally prohibited <br />until the corrective actions are complied with. <br />The Board imposes against the Operator the following three corrective actions: <br />(1) The Board orders the Operator to submit an interim bond increase in the <br />amount of $15,000 or if additional investigation determines a different <br />amount, that amount will be submitted within 30 days of the signature <br />date of the Board Order. <br />(2) The Board orders the Operator to provide all materials necessary to <br />allow Division approval of a technical revision of the reclamation permit <br />within 45 days of the signature date of the Board Order addressing a <br />sedimentation control plan, including strixctural designs, construction <br />details, a schedule of compliance and, if necessary, engineer <br />certifications for designs. <br />(3) The Board orders the Operator to provide as-built drawings and engineer <br />certifications for structures addressed in Corrective Action number two <br />above, <br />The Board imposes a civil penalty of $100 per day for 46 days for a total penalty of <br />$4,600.00_ The total civil penalty shall be due and payable within thirty days of the signature <br />date of the signed Board Order. <br />DONE AND ORDERED this 4 day of 1. C, 2009. <br />FOR THE COLORADO ADD <br />Cc1Qmlo Stone Quarries, Inc, <br />Yule Marble Quarry <br />M-1999-058 <br />MY-;QWQ23 <br />e r`son, Acting Chair <br />Land Reclamation Board <br />TION BOARD <br />4 <br />CM ITO anti-i I q'AX iW qnV I T?I"qH ZZVZVSVOLG OT :VT 6002/£0/60
The URL can be used to link to this page
Your browser does not support the video tag.