Laserfiche WebLink
of the access roads on the surface of the waste piles, and on marble fines pocket between the marble <br />blocks on the side of the waste piles. <br />Final Reclamation Timetable <br />Task Description Time months <br />1 Remove diesel tank and generator. 1 <br />2 Backfill and fence portals 2 <br />3 Reve etated disturbed areas. 3 <br />Total 5 <br />2. Worst Case Reclamation Costs <br />Worst case reclamation occurs when mining ceases and reclamation begins immediately, and the <br />disturbance is the maximum possible over the mine's life. The current conditions match this description. <br />This includes closure of portals, revegetation of disturbed surface areas, and completion of permanent <br />sediment control structures. The table below represents a cost estimate of such work based on the <br />assumption that an independent contractor is hired to complete the work. <br />Topsoil import estimates are based on obtaining the topsoil from ranches or development sites on the <br />west side of McClure Pass and hauling the material to the site. The cost is based on a purchase price of <br />$7/cubic yard and transporting it to the site for a cost of $5 per cubic yard. <br />Yule Quarry April 10 40