My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-05-21_PERMIT FILE - M1987151
DRMS
>
Day Forward
>
Permit File
>
Minerals
>
M1987151
>
2010-05-21_PERMIT FILE - M1987151
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:12:13 PM
Creation date
6/2/2010 8:12:52 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1987151
IBM Index Class Name
PERMIT FILE
Doc Date
5/21/2010
Doc Name
Review response
From
Greg Lewicki and Associates, PLLC
To
DRMS
Email Name
DMC
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
This berm will be vegetated to prevent erosion during mining. No storm water will discharge from the <br />site. <br />4. Topsoil Management <br />There is very little available topsoil on site, and all of it is in the undisturbed area being added as part of <br />this amendment. This is estimated to be approximately 1900 cubic yards of salvageable topsoil. This <br />topsoil will be stored on site to be used in reclamation. The storage location is shown on Map C-2. <br />5. Facilities <br />There are no permanent facilities to be located in the permit area. A mobile crusher and screen will be <br />brought on site as needed. Mining will take place with a loader and dozer. There is no fuel storage on <br />site. <br />6. Mining Timetable <br />Montrose County anticipates mining the Soderquist Pit at a maximum rate of 10,000 tons of material <br />annually. At a total reserve of roughly 328,500 tons, the total mine life of the pit will be approximately <br />33 years. <br />7. Schedule of Operations <br />Mining has been conducted at the Soderquist Pit under a DRMS permit since 1987. The material mined <br />at the pit is used by Montrose County for road maintenance activities in that part of the county. Because <br />of this the mining rate is not expected to be above 10,000 tons annually at any point in the pit's <br />existence. <br />Excavation of the amended area to the west of the current mining pit will take place after the current <br />area is exhausted in approximately 26 years. Mining should be complete in 2036, with reclamation <br />completing in the following year. <br />Soderquist Pit March 10 10
The URL can be used to link to this page
Your browser does not support the video tag.