Laserfiche WebLink
6 (Form. 2- Public) <br />Describe the estimated topsoil depth and how topsoil will be salvaged, stockpiled and redistributed for the re-establishment of <br />vegetation. Specify approximate topsoil redistribution depth: <br />Throughout the project area the topsoil ranges from 6-18 inches in <br />thickness. Durinq soil sampling activities, topsoil will be - separated <br />and immediately replaced. vegetation and any salvaged root material <br />will also be replaced. <br />4. Describe how drill holes will be plugged (refer to Rule 5.4 of the Rules for required abandonment procedures): <br />No drill holes are proposed. <br />>. Describe how portals, adits, shafts, ponds, excavations, or other disturbances will be reclaimed (refer to Rule 3 and Rule 5 for <br />specific reclamation performance standards). You may wish to contact the Division for closure specifications. <br />During soil sampl:.n activities, topsoil will be separated and <br />immediately replaced. vegetation and any salvaged root material <br />will also be replaced. <br />6, Describe how roads will be reclaimed or returned to their pre-prospecting (or better) condition.: <br />No_...?ds_„wl_l__,,_be„_,,,construc_ted_, as part of this prospecting effort.