My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-05-27_PERMIT FILE - P2010011 (4)
DRMS
>
Day Forward
>
Permit File
>
Prospect
>
P2010011
>
2010-05-27_PERMIT FILE - P2010011 (4)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:12:31 PM
Creation date
6/2/2010 7:27:04 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
P2010011
IBM Index Class Name
PERMIT FILE
Doc Date
5/27/2010
Doc Name
New NOI- Prospecting, Form 2
From
Powertech (USA) Inc.
To
DRMS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
POWERTECh (USA) INC. <br />4.0 Location of Gamma Survey <br />Refer to Attachments A and Attachment B for tabulated and map locations of the gamma survey <br />activities. <br />5.0 Description of Soil Sampling Methods and Equipment <br />Depth of soil samples will be collected from 0-5 cm. Number of expected soil samples to be collected is <br />five. Soil samples will be collected at each air particulate station. Exact locations are noted below. <br />Areas designated for soil collection will be prepared by digging a 3-4 inch hole with a small clean shovel; <br />sides of the hole will be scraped to obtain a fresh soil sample; the top 2 inches of soil will be collected. <br />The sample will be placed into a collection bag or other air-tight container, labeled and sent in for <br />analysis. The equipment used will be cleaned between sampling locations and gloves will be changed <br />before each sample collection to prevent cross contamination. Each hole will be back-filled; if grass is <br />present, the grass will be replaced over the sampled area. <br />6.0 Location of Soil Sampling Activities <br />Refer to Attachment A and Attachment B for tabulated and map locations of the surface soil sampling <br />activities. It is expected that the total number of soil samples to be collected is five. However, if <br />anomalous gamma survey readings are encountered, additional soil samples may be obtained. <br />Note to Reviewer: <br />This second phase gamma-ray survey plan was presented to CDPHE on 25th of May, 2010. <br />Other than the following recommendations there were no objections: <br />• add perpendicular transects to the proposed transects to validate survey data <br />• if anomalous soils are encountered during the survey, additional 0-60cm profile samples be <br />collected and analyzed <br />Powertech will incorporate the CDPHE suggestions into the gamma-ray survey effort. <br />Addendum 1
The URL can be used to link to this page
Your browser does not support the video tag.