My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-05-19_GENERAL DOCUMENTS - P2009038
DRMS
>
Day Forward
>
General Documents
>
Prospect
>
P2009038
>
2010-05-19_GENERAL DOCUMENTS - P2009038
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:12:09 PM
Creation date
6/1/2010 8:44:15 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
P2009038
IBM Index Class Name
GENERAL DOCUMENTS
Doc Date
5/19/2010
Doc Name
Road use permit
From
Forest Service
To
Charles Ponchak
Email Name
THM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Breakdown of traffic on Forest Service Roads <br />for Smith road construction project <br />***THIS IS AN EXAMPLE SHOWING HOW TO COMPLETE THE FORM*** <br />Phase 1: Traffic on NFSRs from road improvements and construction operations. <br />What is the operating season for Phase 1? June 15-July 20. 2010 <br />Is snowplowing requested? No <br />Type of vehicle Number of trips per day or week, describe route Total Highest <br />(use one row per and one-way mileage number of Weight, <br />type of vehicle) days pounds <br />Light duty pickup 3 trucks making two roundtrips per day from 25 Xxxx <br />carrying crew Collbran to project area on NFSR 111. 25 miles. <br />Heavy duty pickup 1 truck making two roundtrips per day from Dry 25 Xxxx <br />with water tank Creek Reservoir to project area on NFSR 111 and <br /> NFSR 115. <br /> 3 miles on NFSR 115; 7 miles on NFSR 111. <br />Tractor trailer/ 1 roundtrip per week from Collbran to project 5 120,000 <br />lowboy carrying area on NFSR 111 loaded/unloaded. 25 miles <br />D-6 dozer
The URL can be used to link to this page
Your browser does not support the video tag.