Laserfiche WebLink
Breakdown of traffic on Forest Service Roads <br />for Smith road construction project <br />***THIS IS AN EXAMPLE SHOWING HOW TO COMPLETE THE FORM*** <br />Phase 1: Traffic on NFSRs from road improvements and construction operations. <br />What is the operating season for Phase 1? June 15-July 20. 2010 <br />Is snowplowing requested? No <br />Type of vehicle Number of trips per day or week, describe route Total Highest <br />(use one row per and one-way mileage number of Weight, <br />type of vehicle) days pounds <br />Light duty pickup 3 trucks making two roundtrips per day from 25 Xxxx <br />carrying crew Collbran to project area on NFSR 111. 25 miles. <br />Heavy duty pickup 1 truck making two roundtrips per day from Dry 25 Xxxx <br />with water tank Creek Reservoir to project area on NFSR 111 and <br /> NFSR 115. <br /> 3 miles on NFSR 115; 7 miles on NFSR 111. <br />Tractor trailer/ 1 roundtrip per week from Collbran to project 5 120,000 <br />lowboy carrying area on NFSR 111 loaded/unloaded. 25 miles <br />D-6 dozer