Laserfiche WebLink
Support Facilities <br /> Due to the plugged Thickener Underflow Borehole, TCC is in the process of a minor revision to <br /> temporarily revise permitting actions approved with TR-69. With TR-69 TCC was approved to install <br /> the 6RT borehole to place washplant thickener underflow at the EMD. At the time of the inspection, <br /> work was being conducted at the 6RT borehole to allow an overland pipeline to be connected. No <br /> new surface disturbance will be requested with this temporary overland piping. <br />