Laserfiche WebLink
moves This means SAE is #1 -5 are no longer present in the reclamation Plan. However for the <br />sake of consistency, SAE #6 will still be used to refer to the area of topsoil stripped in advance of <br />the pit, <br />befoutc! it Sect o i 2,85.3(3) M Pie Fac.l.fies Stoi in volume calculations for this pond are give PP <br />AltachmeitR.05.3(3) li�Th an original depress in the landscape at the sal U <br />SAE 06 replaces the previously approved trave rig po. id des g . SAE #6 is designed to detain all <br />runoff from the narrow strip of land in advance of the pit where topsoil stripping is taking place. This <br />width is approximately 100 feet and runs the entire width of the cut from north to south. WFC <br />commits to placing a portion of the topsoil that is being stripped in a continuous berm at the <br />western edge of the pit disturbance for sediment control of this area. The berm will be a minimum <br />of 4 feet high with sideslopes of 2H:1 V. See Map 2.05.3 -1 which shows the berm in relation to the <br />entire pit cross section. <br />aeviseu MARCH 2010 Attachment 2.05.3(3) -7 -5 <br />