My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-05-25_REVISION - C1981008 (31)
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981008
>
2010-05-25_REVISION - C1981008 (31)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:12:26 PM
Creation date
5/26/2010 12:56:22 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981008
IBM Index Class Name
Revision
Doc Date
5/25/2010
Doc Name
Response 1 Revised Pages Section 2.05.3(3) Attachment 2.05.3(3)-6
Type & Sequence
PR6
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
30
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Pond 013 was initially designed for the 2000 Permit Amendment. The pond was constructed in <br />2007. The as built report is included in attachment 2.05.3(3) -21. Due to the decision by WFC to <br />eliminate Pond 010, Ponds 011 and 013 will receive a greater drainage area. This revised <br />design of Pond 013 will demonstrate that the as built pond is sufficient to handle the revised <br />drainage area. <br />Pond 013 is a partially incised pond designed to contain the flow from a 10 year 24 hour storm <br />below the emergency spillway. the valve on the principal spillway pipe is normally held shut. <br />The principal spillway design is an 18 -24" diameter CMP or other pipe which will have a valve <br />on the entrance. This pipe will be stooped down in the inlet side to a 6" valve which will be <br />controlled by a wheel on the pond embankment During normal conditions the valve will be shut <br />to provide 24 hour detention time for each pond during the large events. When a large event <br />occurs the operator will wait a minimum of 36 hours after the storm has ceased to check the <br />water still detained by the pond An Imhoff cane will only be used to determine if the water can <br />be discharged. If an Imhoff cone shows that the water meets the effluent standard of 0 5ml <br />settleable solids per liter, the valve will be opened until the water has dissipated to the valve <br />level It will then be shut to allow detention time for subsequent storms Full sampling and <br />laboratory analyses of the discharge will take place for all dischames, according to the NPDES <br />ep rmit. <br />Pond 013 Design <br />Pond 013 must be able to hold the volume of water runoff and sediment load of the worst case <br />scenario. In order to determine the worst case, a comparison of pre mine and post mine <br />drainage patterns, sediment load, and pit pumping is conducted. <br />Pre Mine Calculations <br />72.4 acre drainage area (See Map 2.05.3(3) -1) <br />Pit water is pumped to Pond 011. No contribution to water volume in Pond 013. <br />Curve Number (CN) to use: From SEDCAD 4 for Windows Help menu: <br />I. Curve Numbers for Other Agricultural Land Category <br />II. Cover type: Pasture, grassland, or range -- continuous forage for grazing <br />REVISED AUGUST 2009 Attachment 2.05.3(3) -6 -3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.