Laserfiche WebLink
A minimum of 3 years of Irrigated Cropland production will be measured atthe reclaimed -site., <br />in the <br />reclaimed <br />6- 1 - II ! I ------ I — - ent metho I This.—thod is consistent wifl"he used h. 1987 — <br />area. This will begin in Year 9 after <br />seeding. For each year, upon completion of a first cutting in a field, the number of bales cut from <br />the field will be counted. A sample of at least 15 bales will be arbitrarily selected and weighed <br />with a portable field scale accurate to 1 pound. A random number generatorwill be used to select <br />PR -06 May 2010 2.05.4(2)(e) - 40 <br />