Laserfiche WebLink
List of Attachments <br />Attachment 2.05.4(2)(c) -1 <br />Reclaimed Krill Drainage Channel Design .............. Attachment 2.05.4(2)(c) -1 -1 <br />Attachment 2.05.4(2)(C) -2 <br />Reclaimed Krill Drainage Channel Design <br />West Lateral ..... ............................... Attachment 2.05.4(2)(c) -2 -1 <br />Attachment 2.05.4(2)(C) -3 <br />Reclaimed San Miguel Power Drainage Channel Design Attachment 2.05.4(2)(c) -3 -1 <br />Attachment 2.05.4(2)(C) -4 <br />Modification to the Number of Stock Ponds Left <br />on the Burbridge Property after Backfilling ............ Attachment 2.05.4(2)(C)- 4 -1 <br />Attachment 2.05.4(2)(C) -5 <br />San Miguel Power Letter <br />Dated <br />20 September 2002 .............................. Attachment 2.05.4(2)(C)- 5 -1 <br />Attachment 2.05.4(2)(C) -6 <br />San Miguel Power Letter <br />Dated <br />17 June 1998 .... ............................... Attachment 2.05.4(2)(C)- 6 -1 <br />Attachment 2.05.4(2)(C) -7 <br />Post Mine Overburden and Backfill Balance Table Attachment 2.05.4(2)(c) -7 -1 <br />(Revised July 2006) <br />