My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-05-25_REVISION - C1981008 (4)
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981008
>
2010-05-25_REVISION - C1981008 (4)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:12:26 PM
Creation date
5/26/2010 10:18:50 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981008
IBM Index Class Name
Revision
Doc Date
5/25/2010
Doc Name
Response 1 Revised Pages Section 2.04.9
Type & Sequence
PR6
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
48
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2) Prime Farmlands - Any area or field where the majority of soils within the field are considered <br />prime farmland soils, where the area has historically been irrigated and intensely managed for <br />value crops such as alfalfa, com, etc., and where there has been and still is an adequate and <br />dependable supply of water for irrigation. In the reclamation plan, lands that meet this criteria have <br />been designated as Irrigated Cropland (IC). For bond release, these lands must meet all the <br />requirements of prime farmlands in the DRMS rules. <br />3) Irrigated Cropland - This is a pre -mine and post -mine land use category (IC) which is based <br />on lands meeting the prime farmland criteria. The acreage of Irrigated Cropland in the pre -mine <br />category could be different than that in the post -mine category, since water availability could <br />change. This is the case with the Morgan fields in the SW comer of the permit area. <br />(Revised October 09) 2.04.9 -18 <br />
The URL can be used to link to this page
Your browser does not support the video tag.