My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-05-25_REPORT - M1986104
DRMS
>
Day Forward
>
Report
>
Minerals
>
M1986104
>
2010-05-25_REPORT - M1986104
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:12:22 PM
Creation date
5/25/2010 11:09:04 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1986104
IBM Index Class Name
REPORT
Doc Date
5/25/2010
Doc Name
Annual report
From
Oldcastle SW Group, Inc.
To
DRMS
Permit Index Doc Type
Annual Fee/Report
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Greg Lewicki And Associates <br />11541 Warrington Court Phone (303) 346-5196 Fax: (303)-346-6934 <br />Parker, CO USA 80138 E-Maikinfo@Iewicki.biz <br />May 21, 2010 <br />Mary Rodriguez <br />Division of Reclamation, Mining and Safety <br />1313 Sherman St. Room 215 <br />Denver, CO 80203 <br />RE: Annual Report, M-1986-104, Montgomery Pit, Oldcastle SW Inc. dba B&B Excavating <br />Mary, <br />Jason Burkey from B&B Excavating has sent in the annual fee. I am sending in the Annual <br />Report Form and report text with the corresponding map showing what activities happened on sit <br />in the previous year and what is planned for the up coming year. <br />Activities that were conducted this year - <br />• An Irrigation Bypass drainage system has been installed on the western portion of the site <br />to allow irrigation water encountered at the toe of the south slope to pass through the site <br />and not mix with onsite stormwater. <br />• Further paving the access road to access the shop and office for the long term use of the <br />site. <br />• No mining was conducted on site. <br />• Asphalt and concrete recycling was conducted. <br />Activities that are planned for next year - <br />• Continue to produce concrete and asphalt using material from an off site source and <br />recycled material. <br />• Finish grading the western most portion of the site. <br />Please give me a call if there are any questions or additional information needed. <br />Sincerely <br />Ryan Ellis, Greg LewicOanAssociates <br />(303) 880-6690 <br />ryan@lewicki.biz
The URL can be used to link to this page
Your browser does not support the video tag.