My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-02-15_GENERAL DOCUMENTS - C1981008
DRMS
>
Day Forward
>
General Documents
>
Coal
>
C1981008
>
2008-02-15_GENERAL DOCUMENTS - C1981008
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:22:54 PM
Creation date
5/24/2010 12:44:57 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981008
IBM Index Class Name
General Documents
Doc Date
2/15/2008
Doc Name
Soils Meeting (Memo)
From
Dan Mathews
To
File
Permit Index Doc Type
General Correspondence
Email Name
SB1
DTM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Generally, for areas that were irrigated prior to mining, and where irrigation water is <br />available for irrigation during and after the liability period, the amount of irrigated land <br />should follow this approximate ratio. One exception will likely be the WFC owned <br />parcel which was irrigated prior to acquisition, and which WFC will likely propose to <br />restore to dryland pasture (one +/- 3 acre parcel of Prime Farmland Soil may be need to <br />be irrigated and restored to Prime Farmland Condition, depending on NRCS <br />determination). <br /> <br />An approach discussed for lands that may have been irrigated prior to mining, but for <br />which water rights are not available or are insufficient, would be to restore lands to an <br />species and subject to dryland pasture success criteria, but grading, soil handling, and <br />provision of irrigation infrastructure would be specified, such that the postmine owner <br />could apply some level of irrigation management with whatever water is available, <br />following bond release. <br /> <br />There are numerous other issues, including detailed seeding plans, crop rotations, soil <br />management practices, revegetation success criteria and sampling plans to name only a <br />few, that will need to be addressed in the Permit Revision. NRCS will need to be <br />involved in development of these plans, as well as in the soil handling and delineation <br />Technical Revision (particularly in regard to Prime Farmland issues). Land owner input <br />will need to be taken into consideration and documented in the Permit Revision <br />application. WFC has indicated that they will be discussing these matters with the permit <br />area landowners prior to submittal of the Permit Revision application. <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.