My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-05-21_REVISION - C1981010 (4)
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981010
>
2010-05-21_REVISION - C1981010 (4)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:12:14 PM
Creation date
5/24/2010 8:41:26 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981010
IBM Index Class Name
REVISION
Doc Date
5/21/2010
Doc Name
2010 Midterm Review Cost Estimate (Memo)
From
Jason Musick
To
Rob Zuber
Type & Sequence
MT6
Email Name
JDM
RDZ
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
151
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
sheet 1 of 2 <br />PROJECT IDENTIFICATION <br />Task # <br />Date <br />User <br />Shift basis : 1 per day <br />Permit or other job action :2010 Midterm Review <br />Task description : Replace Topsoil on DIE Pits <br />HOURLY EQUIPMENT COST <br />Equipment Description <br />Cost Bre <br />Scraper work team -Scraper :Cat 637G w/push-pull <br />-Push dozer:NA <br />Support equipment -Load area :Cat D10R - 10SU (2005) <br />-Dump area :Cat D10R - 10SU (2005) <br />Road maintenance -Motor grader : CAT 16H <br />-Water truck : Water Tanker, 2,500 Gal. <br />CIRCES Cost Estimating Software <br />SCRAPER TEAM WORK <br />Agency or organization name : Colorado Division Of Reclamation Mining And Safety <br />091 State :Colorado Permit/job #: C-1981-010 <br />0310312010 County:Moffat Abbreviation :none <br />JDM Site : Trapper Mine Filename : C010-091 <br />akdown : Scraper Work Team <br />Scraper Dozer Support Equipment <br />Load area Dump area Road Maintenance Equipment <br />Grader Water truck <br />Import data filename : scraper2 NA dozer dozer grader misctruk <br />% Utilization-machine : 100 NA 100 100 100 50 <br />-Ripper attachment : NA NA 0 0 NA NA <br />Ownerhip cost/hour : $109.89 NA $76.61 $76.61 $58.14 $8.32 <br />Operating cost/hour : $163.34 NA $128.30 $128.30 $60.59 $6.94 <br />Ripper op. cost/hour : NA NA $0.00 $0.00 $0.00 NA <br />Operator cost/hour : $24.98 NA $38.54 $38.54 $24.50 $38.70 <br />Unit subtotals : $298.21 NA $243.45 $243.45 $143.23 $53.96 <br />Number of units : 8 0 1 1 1 1 <br />Group subtotals : Work : $2,385.71 Support : $486.89 Maintenance : $197.19 <br />Total work team cost/hour : $3,069.78 <br />- _ _.... ........ <br />MATERIAL QUANTITIES <br />Initial Swell Loose <br />volume : 488,686 BCY factor : 1.429 volume : 698.122 LCY <br />Source of quantity take-off :Appendix A Table 1.4-9 <br />Source of estimated swell factor : CAT
The URL can be used to link to this page
Your browser does not support the video tag.