Laserfiche WebLink
PROJECT IDENTIFICATION <br />Task #: 084 <br />Date : 0310312010 <br />User : JDM <br />CIRCES Cost Estimatina Software <br />BULLDOZER WORK <br />Permit/job# : C-1981-010 <br />Abbreviation : none <br />Filename : C010-084 <br />State : Colorado <br />County : Moffat <br />Site :Trapper Mine <br />Agency or organization name : Colorado Division Of Reclamation, Mining <br />Permit or other job action :2010 Midterm Review <br />Task description :Regrade West Horse impoundment <br />HOURLY EQUIPMENTT <br />COST <br />Basic machine : Cat D10R - 10SU (2005) Horsepower:- 570 <br />Blade type : Semi-Universal <br />Attachment no. 1 : ROPS Cab Shift basis:- 1 per day <br />Attachment no. 2 :3-shank ripper <br />Data source : (CRG) <br /> Utilization % <br />Cost Breakdown : Ownership cost/hour : $89.77 NA <br /> Operating cost/hour : $128.30 100 <br /> Ripper op. cost/hour : $0.00 0 <br /> Operator cost/hour : $38.54 NA <br /> Total unit cost/hour : $256.60 Total fleet cost/hour : $256.60 <br />MATERIAL QUANTITIES <br />Initial Swell Loose <br />volume : 3,315 LCY factor : NA volume : 3,315 LCY <br /> <br />Source of estimate d volume :Appendix A Table 1.4-6 <br />Source of estimated swell factor : NA <br /> <br />HOURLY PRODUCTION Job Condition Correction Factors Source <br /> Operator skill : 0.75 (avg.) <br />Average push distance : 55 feet Material consistency : 1.00 (Cat HB) <br />Unadjusted hourly production : 2,670.0 LCY/hr Dozing method : 1.00 (gen.) <br /> Visibility: 1.00 (avg.) <br />Material consistency description : Job efficiency : 0.83 (1shift1day) <br />Consolidated stockpile Spoil pile : 0.80 (fnd-rf) <br /> Push gradient : 0.79 (Cat HB) <br />Average push gradient : 10.00 % (pos) Altitude : 1.00 (Cat HB) <br />Average site altitude : 6,400 feet Material weight : 0.90 (Cat HB) <br /> Blade type : 1.00 (S/SU/U) <br />Material weight : 2550 lbs/LCY Net correction : 0.35 <br />Weight description <br />Earth - Dry packed Adjusted unit production : 943.24 LCY/hr <br /> Adjusted fleet production : 943.24 LCY/hr <br />JOB TIME AND COST <br />Fleet size : 1 Dozer(s) Total job time : 3.51 Hours <br />Unit cost : $0.272 /LCY Total job cost : $902 <br /> <br />And Safety