My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-05-21_REVISION - C1981010 (4)
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981010
>
2010-05-21_REVISION - C1981010 (4)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:12:14 PM
Creation date
5/24/2010 8:41:26 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981010
IBM Index Class Name
REVISION
Doc Date
5/21/2010
Doc Name
2010 Midterm Review Cost Estimate (Memo)
From
Jason Musick
To
Rob Zuber
Type & Sequence
MT6
Email Name
JDM
RDZ
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
151
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CIRCES Cost Estimating Software <br />BULLDOZER WORK <br />PROJECT IDENTIFICATION <br />Task # : 080 State : Colorado Permit/job# : C-1981-010 <br />Date : 0310312010 County : Moffat Abbreviation :none <br />User : JDM Site : Trapper Mine Filename : C010-080 <br />Agency or organization name : Colorado Division Of Reclamation, Mining And Safety <br />Permit or other job action :2010 Midterm Review <br />Task description :Regrade Coyote Impoundment <br />r <br />HOURLY EQUIPMENT COST _ <br /> Basic machine : Cat D10R - 10SU (2005) Horsepower : 570 <br /> Blade type : Semi-Universal <br /> Attachment no. 1 :ROPS Cab Shift basis : 1 per day <br /> Attachment no. 2 :3-shank ripper <br /> Data source : (CRG) <br /> Utilization % <br />Cost Breakdown : Ownership cost/hour : $89.77 NA <br /> Operating cost/hour : $128.30 100 <br /> Ripper op. cost/hour : $0.00 0 <br /> Operator cost/hour : $38.54 NA <br /> Total unit cost/hour : $256.60 Total fleet cost/hour : $256.60 <br /> <br />MATERIAL QUANTITIES <br />Initial Swell Loose <br />volume : 83,750 LCY factor : NA volume : 83.750 LCY <br />Source of estimated volume: Appendix A Table 1.4-6 <br />Source of estimated swell factor : NA <br />HOURLY PRODUCTION Job Condition Correction Factors Source <br />Average push distance : 500 feet <br />Unadjusted hourly production : 410.8 LCY/hr <br />Material consistency description <br />Consolidated stockpile <br />Average push gradient:- 10.00 % (pos) <br />Average site altitude : 6,400 feet <br />Material weight <br />Weight description <br />Earth - Dry packed <br />Z550 Ibs/LCY <br />Operator skill : 0.75 (avg.) <br />Material consistency : 1.00 (Cat HB) <br />Dozing method : 1.00 (gen.) <br />Visibility: 1.00 (a vg.) <br />Job efficiency : 0.83 (1 shift/day) <br />Spoil pile : 0.80 (fnd-rf) <br />Push gradient : 0.79 (Cat HB) <br />Altitude : 1.00 (Cat HB) <br />Material weight : 0.90 (Cat HB) <br />Blade type : 1.00 (S/SU/U) <br />Net correction : 0.35 <br />Adjusted unit production : 145.12 LCY/hr <br />Adjusted fleet production : 145.12 LCY/hr <br />JOB TIME AND COST <br />Fleet size : 1 Dozer(s) Total job time : 577.09 Hours <br />Unit cost : $1.768 /LCY Total job cost : $148,083
The URL can be used to link to this page
Your browser does not support the video tag.