Laserfiche WebLink
CIRCES Cost Estimating Software <br />BULLDOZER WORK <br />PROJECT IDENTIFICATION <br />Task #: 038 State :Colorado Permit/job# :C-1981-010 <br />Date : 0310312010 County:Moffat Abbreviation :none <br />User : JDM Site :Trapper Mine Filename : C010-038 <br />Agency or organization name : Colorado Division Of Reclamation, Mining And Safety <br />Permit or other job action :2010 Midterm Review <br />Task description : Regrade EF haul Road <br />HOURLY EQUIPMENT COST <br />Basic machine : Cat D10R - 10SU (2005) <br />Blade type : Semi-Universal <br />Attachment no. 1 :ROPS Cab <br />Attachment no. 2:3-shank ripper <br />Horsepower: 570 <br />Shiftbasis : 1 per day <br />Data source : (CRG) <br /> Utilization % <br />Cost Breakdown : Ownership cost/hour : $89.77 NA <br /> Operating cost/hour : $128.30 100 <br /> Ripper op. cost/hour : $0.00 0 <br /> Operator cost/hour : $38.54 NA <br /> Total unit cost/hour : $256.60 Total fleet cost/hour : $1,026.41 <br />MATERIAL QUANTITIES <br />Initial Swell Loose <br />volume : 20,000 B CY factor : 1.250 volume : 25,000 LCY <br /> <br />Source of estimate d volume :Appendix A Table 1.4-5 <br />Source of estimated swell factor :Operator Estimate <br /> <br />HOURLY PRODUCTION Job Condition Correction Factors Source <br /> Operator skill : 0.80 (user) <br />Average push distance : 80 feet Material consistency : 1.00 (Cat HB) <br />Unadjusted hourly production : 2,028.0 LCY/hr Dozing method : 1.00 (gen.) <br /> Visibility: 1.00 (avg.) <br />Material consistency description : Job efficiency : 0.83 (1shift1day) <br />Consolidated stockpile Spoil pile : 0.80 (fnd-ro <br /> Push gradient : 0.81 (Cat HB) <br />Average push gradient : 9.00 % (pos) Altitude : 1.00 (Cat HB) <br />Average site altitude : 6,400 feet Material weight : 0.90 (Cat HB) <br /> Blade type : 1.00 (S/SU/U) <br />Material weight : 2550 Ibs/LCY Net correction : 0.39 <br />Weight description <br />Earth - Dry packed Adjusted unit production : 787.23 LCY/hr <br /> Adjusted fleet production : 3,148.92 LCY/hr <br />JOB TIME AND COST <br />Fleet size : 4 Dozer(s) Total job time : 7.94 Hours <br />Unit cost : $0.326 /LCY Total job cost : $8,149 <br />