My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-05-21_REVISION - C1981010 (4)
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981010
>
2010-05-21_REVISION - C1981010 (4)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:12:14 PM
Creation date
5/24/2010 8:41:26 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981010
IBM Index Class Name
REVISION
Doc Date
5/21/2010
Doc Name
2010 Midterm Review Cost Estimate (Memo)
From
Jason Musick
To
Rob Zuber
Type & Sequence
MT6
Email Name
JDM
RDZ
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
151
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
sheet 1 of 2 <br />CIRCES Cost Estimatina Software <br />TRUCK/LOADER TEAM WORK <br />PROJECT IDENTIFICATION <br />Agency or organization name : Colorado Division Of Reclamation Mining And Safety <br />Task 025 State : Colorado Permit/job # : C-1981-010 <br />Date : 0310412010 County :Moffat Abbreviation :none <br />User: JDM Site : Trapper Mine Filename : C010-025 <br />Permit or other job action :2010 Midterm Review <br />Task description : Regrade K-Pit Truck/Loader Costs <br />HOURLY EQUIPMENT COST Shift basis : 3 per day <br />(Equipment Description <br />Truck/loader team -Truck : Cat 777D <br />-Loader : CAT 992G high lift <br />Support equipment -Load area : NA <br />-Dump area : Cat D10R - 10SU (2005) <br />Road maintenance -Motor grader : CAT 16H <br />-Water truck : Water Tanker. 2.500 Gal. <br />Cost Breakdown : Truck/Loader Work Team <br />Truck Loading Tool Support Equipment <br />Load Area Dump Area Road Maintenance Equipment <br />Motor Grader Water Truck <br />Import data filename : truck2 loader NA dozer grader misctruk <br />% Utilization-machine : 70 100 NA 100 50 50 <br />-Ripper attachment : NA NA NA 0 NA NA <br />Ownership cost/hour : $39.94 $88.59 NA $37.63 $27.26 $4.56 <br />Operating cost/hour : $79.72 $149.80 NA $128.30 $30.29 $6.94 <br />Ripper op. cost/hour : NA NA NA $0.00 $0.00 NA <br />Operator cost/hour : $22.54 $38.97 NA $38.79 $24.75 $38.95 <br />Unit subtotals : $142.20 $277.36 NA $204.72 $82.30 $50.45 <br />Number of units : 4 1 0 1 1 1 <br />Group subtotals : Work : $846.15 Support : $204.72 Maintenance : $132.76 <br />Total work team cost/hour : $1,183.62 <br />MATERIAL QUANTITIES <br />Initial Swell Loose <br />volume : 5,644,528 BCY factor : 1.250 volume : 7,055,660 LCY <br />Source of quantity take-off :Operator Estimate <br />Source of estimated swell factor :Operator Estimate <br />Material purchase cost : $0.00 /LCY Total cost : $0 <br />HOURLY PRODUCTION <br />Truck Capacity : <br />Truck Payload (weight) Basis : Truck Bed (volume) Basis : <br />Material weight : 2,475 pounds/LCY Struck volume : <br />Descr.: USER-PROVIDED WEIGHT DATA Heaped volume : <br />Rated payload : 199,220 pounds Average volume : <br />Payload capacity : 80.49 LCY Adjusted volume': <br />Final truck volume based on number of loader passes <br />truck volume adjusted to not exceed rated payload or heaped volume <br />Loading Tool Capacity : <br />Rated capacity (nom. heaped) : 15.500 LCY <br />Descr.: Blasted rock - well blasted (80 - 95%) <br />Bucket fill factor : 0.875 <br />Adjusted bucket capacity: 13.562 LCY <br />54.80 LCY <br />78.80 LCY <br />66.80 LCY <br />78.80 LCY <br />67.81 LCY <br />Job Condition Corrections : Site altitude (ft.): - 6,400 <br /> Truck Loader Source <br />Altitude adj.: 1.000 1.000 (Cat HS) <br />Job efficiency : 0.790 0.790 (3 shifts/day) <br />Net correction : 0.790 0.790 <br />WQW
The URL can be used to link to this page
Your browser does not support the video tag.