Surface Blasting Work cont'd Task #: 020 sheet 2 of 2 <br />BLASTING MATERIALS QUANTITIES QUANTITY UNIT <br />Total quantity of stemming required 40.15 cubic yards <br />Total quantity of explosives required 106,098 pounds <br />Total quantity of det. cord/fuse/wire required 18,257 fin. feet <br />Quantity of blasting caps used per blasthole 2 cap(s) <br />Total quantity of blasting caps required 1128 caps <br />Quantity of primers used per blasthole 1 rimer(s) <br />Total quantity of primers required 564 rimers <br />Quantity of delays used per blasthole 3 delay(s) <br />Total quantity of delays required 1694 delays <br />HOURLY EQUIPMENT COST Shiftbasis : 1 per day Data source : (CRG data) <br />Drilling equipment - Drill : REEDRILL SK35, 9.0 in. <br />- Drill pad preparation : Cat D10R - 10SU (2005) <br />Misc. drilling support equipment: NA <br />Misc. explosives support equipment : NA <br />Explosives delivery/prep. - Bulk truck :IFuel Tanker, 6x4, 210 HP <br />- CaD truck :Light Dutv Pickup, 4x4. 314 T. <br />Cost Breakdown : Drilling <br />Equipment Drill Pad <br />Preparation Misc. Drill Misc. Expl. <br />Support Support Explosives <br />Bulk Truck Delivery <br />Cap Truck <br />Import data filename : drilling dozer NA NA misctruk misctruk <br />Utilization -machine+att. no. 1 : 100 100 NA NA 50 50 <br />-ripper or attachment no. 2 : NA NA NA NA NA NA <br />Equipment ownership $/hr : $50.38 $76.61 NA NA $10.90 $3.40 <br />Machine+att. 1 operating $/hr : $115.96 $128.30 NA NA $15.14 $3.61 <br />Ripper or att. 2 operating $/hr : $0.00 $0.00 NA NA $0.00 $0.00 <br />Operator+additional labor $/hr : $25.58 $38.54 NA NA $38.70 $19.49 <br />Unit subtotals : $191.92 $243.45 $0.00 $0.00 $64.74 $26.50 <br />Number of units : 1 1 0 0 1 1 <br />Group subtotals : $191.92 $243.45 $0.00 $0.00 $64.74 $26.50 <br />Total work team cost/hour : $526.61 <br />MATERIALS COST <br /> Description Unit Unit Cost Quantity Total Cost <br />Blasting agent : Bulk ANFO nom. density pound $0.221 106,098.44 $23,447.76 <br />Primers or boosters : Cast primer, 2.0 lb each $6.835 564.00 $3,854.94 <br />Blasting caps: Non-electric cap, delay each $3.300 1,128.00 $3,722.40 <br />Det. cord, fuse or wire : Detaline Detacord, 2.4 gr. linear foot $0.132 18,257.25 $2,409.96 <br />Delays: MS connectors each $4.648 1,694.00 $7,873.71 <br />Miscellaneous: none required NA $0.00 0.00 $0.00 <br />Drill bits' : bit life = 1,750.0 linear feet $2,279.00 3.99 $9,089.30 <br />bit life unit = linear foot, bit cost unit = each (per bit) Total materials cost : $50,398.07 <br />DRILLING AND EXPLOSIVES PREPARATION TIME <br /> Job Condition Correction Factors - Site altitude : 7,100 feet <br /> Altitude adjustment : 0.95 (DMG est.) <br />Total drilling length : 6,980 linear feet Job efficiency factor : 0.67 (Ch. Exc. HB) <br />Unadjusted drilling rate : 82.00 feet/hour Adjusted drilling rate : 52.19 feet/hour <br />Drilling time : 133.72 hours Explosives prep. time : 100.00 hours <br />JOB TIME AND COST Total job time : 233.73 hours <br />Total unit cost : $2.386 per cu. yd. Total job cost : $117,742