Laserfiche WebLink
CIRCES Cost Estimating Software <br />BULLDOZER WORK <br />PROJECT IDENTIFICATION <br />Task #: 010 State :Colorado Permit/job# :C-1981-010 <br />Date : 0310312010 County :Moffat Abbreviation :none <br />User : JDM Site :Trapper Mine Filename : C010-010 <br />Agency or organization name : Colorado Division Of Reclamation, Mining And Safety <br />Permit or other job action :2010 Midterm Review <br />Task description :Z Dip Pit (Spoil Side) <br />HOURLY EQUIPMENT COST <br />Basic machine : Cat D11 R - 11 SU (2005) Horsepower : 850 <br />Blade type : Semi-Universal <br />Attachment no. 1 : ROPS Cab Shift basis : 3 per day <br />Attachment no. 2 :NA <br />Data source : (CRG) <br /> Utilization % <br />Cost Breakdown : Ownership cost/hour : $85.74 NA <br /> Operating cost/hour : $209.76 100 <br /> Ripper op. cost/hour : $0.00 NA <br /> Operator cost/hour : $38.79 NA <br /> Total unit cost/hour : $334.29 Total fleet cost/hour : $1,002.86 <br />MATERIAL QUANTITIES <br />Initial Swell Loose <br />volume : 625,898 LCY factor : NA volume : 625,898 LCY <br /> <br />Source of estimate d volume : Permit Appendix A, table 1.4-3 <br />Source of estimated swell factor : Cat <br /> <br />HOURLY PRODUCTION Job Condition Correction Factors Source <br /> Operator skill : 0.80 (user) <br />Average push distance : 455 feet Material consistency : 1.00 (Cat HB) <br />Unadjusted hourly production : 671.1 LCY/hr Dozing method : 1.17 (user) <br /> Visibility : 0.90 (user) <br />Material consistency description : Job efficiency : 0.79 (3shifts /day) <br />Consolidated stockpile Spoil pile : 1.00 (doz-oc) <br /> Push gradient : 1.22 (Cat HB) <br />Average push gradient : 10.00 % (neg) Altitude : 1.00 (Cat HB) <br />Average site altitude : 7,000 feet Material weight : 0.93 (user) <br /> Blade type : 1.00 (S/SU/U) <br />Material weight : 2475 lbs/LCY Net correction : 0.76 <br />Weight description : <br />USER-PROVIDED WEIGHT DATA Adjusted unit production : 508.42 LCY/hr <br /> Adjusted fleet production : 1,525.26 LCY/hr <br /> <br />JOB TIME AND COST <br />Fleet size : 3 Dozer(s) Total job time : 410.36 Hours <br />Unit cost : $0.658 /LCY Total job cost : $411,530 <br /> <br />V