My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-05-21_REVISION - C1981010 (4)
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981010
>
2010-05-21_REVISION - C1981010 (4)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:12:14 PM
Creation date
5/24/2010 8:41:26 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981010
IBM Index Class Name
REVISION
Doc Date
5/21/2010
Doc Name
2010 Midterm Review Cost Estimate (Memo)
From
Jason Musick
To
Rob Zuber
Type & Sequence
MT6
Email Name
JDM
RDZ
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
151
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CIRCES Cost Estimating Software <br />EQUIPMENT MOBILIZATION / DEMOBILIZATION <br />PROJECT IDENTIFICATION <br />Agency or organization name : Division Of Reclamation Mining And Safety <br />Task #: 131 State : Colorado Permit/job #: C-1981-010 <br />Date : 0310412010 County :Moffat Abbreviation :none <br />User : JDM Site : Trapper Mine Filename : C010-131 <br />Permit or other job action :2010 Midterm Review <br />Task description :Mobilize and Demobilize from Hayden, CO <br /> <br />EQUIPMENT TRANSPORT RIG COST Shift basis : 1 per day <br /> Cost data source : CRG Data <br />Truck tractor description : Generic on-highway truck tractor, 6x4, diesel powered, 400 HP (2nd half, 2006) <br />Truck trailer description :Generic folding gooseneck, drop deck equipment trailer (25T, 50T, and 1007) <br />Available rig capacities : 0-25 Tons 26-50 Tons 51+ Tons <br />Cost Breakdown : Ownership cost/hour : $16.63 $18.37 $22.33 <br />Operating cost/hour : $44.38 $46.13 $50.07 <br />Operator cost/hour : $27.66 $27.66 $27.66 <br /> <br />Helper cost/hour : <br />$0.00 <br />$25.39 CIO <br />$25.39 <br />Total Unit Cost/hour : $88.67 $117.55 $125.45 <br /> <br />NON-ROADABLE EQUIPMENT <br />Machine <br />Description Weight/unit <br />(Tons) Ownership <br />Cost/hr/unit Haul Rig <br />Cost/hr/unit Fleet Size <br />(No. units) Haul Trip <br />Cost/hr/fleet Return Trip <br />Cost/hr/fleet DOT permit <br />Cost/fleet <br />-Cat D1 1R - 11SU (2005) 147.17 $156.13 $125.45 8 $2,252.62 $1,003.60 $0.00 <br />-Cat D10R - 10SU (2005) 92.16 $76.61 $125.45 4 $808.23 $501.80 $0.00 <br />-Cat 637G w/push-pull 59.08 $109.89 $125.45 10 $2,353.42 $1,254.50 $0.00 <br />-CAT 16H 27.28 $58.24 $117.55 1 $175.79 $117.55 $0.00 <br />-Light plant, 30 ft. tower, 4 li 1.46 $2.59 $88.67 4 $365.05 $354.68 $0.00 <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />Subtotals : $5,955.12 $3,232.13 $0.00 <br />sheet 1 of 2
The URL can be used to link to this page
Your browser does not support the video tag.