Laserfiche WebLink
same; reclaimed area mean production is greater than % of reference area me an <br />production. We rre able to intentionally create the parenthesis error and <br />obtained the sane erroneous value as the consultant, and this value (3705.3) is also <br />listed on the Attachment 2 spreadsheet. <br />c) The same minor error (use of alpha error probability value of 0.1 for table t- <br />statistie), and the sane more serious error (Excel formula error w ith resultant <br />extremely high value for the calculated t- statistic) were both incorporated into the <br />success demonstrations for the 2008 IP production data, the 2007" Dr land Pasture <br />production data, and the 2008 Dryland Pasture production data. <br />Please re-run the - sample reverse null t -tests for 2007 and 2008 1P and DP production success <br />demonstrations using the appr .02 alpha error probability for the table t- statistic, and the <br />corrected Excel formula for the calculated t- statistic, and reprise Production Text Tables 2, 4, 6, <br />and 8 with the corrected values. If the success results for any particular comparison change or <br />are reversed based on the corrected test results, the corresponding "Comparison to Standard" <br />narrative will need to be revised, along with other narrative sections of the application, as <br />appropriate. <br />r0 <br />• <br />