Laserfiche WebLink
Table No. 2 Amendments are highlighted in green Applegate <br />Lafarge West, Inc. : Group, ii. <br />Combined South Platte River Substitute Supply Plan <br />Combined South Platte River Water Balance & Replacement Requirements <br /> T I Dewatering Required <br />Month Lagged, Lagged Transit Replacements <br /> Mining Depletions Losses from Aurora <br /> Depletions <br /> '(acre-feet) (acre-feet) (acre-feet) (acre-feet) <br /> A B C D <br />Apr-10 10.03 0.59 0.53 11.15 <br />May-10 11.60 0.50 0.61 12.71 <br />Jun-10 L3:94 0.43 0.72 15,09 <br />Jul-10 15.36 0.37 0.79 16.52 <br />Aug-10 1435' 0.32 0.73 15.40 <br /> <br />Sep-10 ;r <br />14.25 <br />0.27 <br />0.73 <br />15.25 <br />Oct-10 1520 0.23 0.78 16.31 <br />Total 2.7 4.9 X02.4 <br />(A) Total mining depletions from the mining sites. See Table No. 1. <br />(B) Impacts from dewatering Lupton Lakes from May-08 to Sep-08 <br />(C) Transit losses of 5% from Metro WWTP to sites, (A+B)*0.05 <br />(D) Required replacements, (A+B+C) <br />NV9100 Lafarge SWSPsMisciplines (Technical)\WRPM1Water Rights%SWSPs%South Platte Combined\2010 AMENDMENT12010 Estimated Combined Renewal CU 04 2610 Revisions need where shown.xls