Laserfiche WebLink
Table No. 2 Amendments are highlighted in green Applegate <br />Inc. Group. Ina <br />Lafarge West, <br />Combined South Platte River Substitute Supply Plan <br />Combined South Platte River Water Balance & Replacement Requirements <br /> o Dewatering Required <br />Month Lagged Lagged Transit Replacements <br /> Mining Depletions Losses from Aurora <br /> Depletions <br /> (acre-feet) (acre-feet) (acre-feet) (acre-feet) <br /> A (13) (C) D <br />Apr-10 10.03 0.59 0.53 11.15 <br />May-10 11.60 0.50 0.61 12.71 <br />Jun-10 13.94. 0.43 0.72 15.09 <br />Jul-10 '15.36 0.37 0.79 16.52 <br /> <br />Aug-10 >a? <br />14,35 <br />0.32 <br />0.73 <br />15.40 <br />Sep-10 14.25 0.27 0.73 15.25 <br /> <br />Oct-10 15.30 0.23 0.78 16.31 <br />Total 2.7 4.9 E 2.4 <br />(A) Total mining depletions from the mining sites. See Table No. 1. <br />(B) Impacts from dewatering Lupton Lakes from May-08 to Sep-08 <br />(C) Transit losses of 5% from Metro WWTP to sites, (A+B)*0.05 <br />(D) Required replacements, (A+B+C) <br />NA09100 Lafarge SWSPsIDisciplines (Technical)\WRPM1Water Rights%SWSPSISouth Platte Combined12010 AMENDMENMO10 Estimated Combined Renewal CU 04 2610 Revisions need where shown.xls