Laserfiche WebLink
-4- <br />12. Primarv future_(Post-mining) land use (check one): <br />U Cropland(CR) ?J Pastureland(PL) <br />?? Rangeland(RL) Forestry(FR) <br />Residential(RS) Recreation(RC) <br />Developed Water Resources(WR) <br />J_j Pastureland(PL) <br />Rangeland(RL) Forestry(FR) <br />Residential(RS) Recreation(RC) <br />Developed Water Resources(WR) <br />13. Primary present land use check one <br />Cropland(CR) - - <br />General Agriculture(GA) <br />Wildlife Habitat(WL) <br />Industrial/Commercial(IC) <br />e Solid Waste Disposal(WD) <br />General Agriculture(GA) <br />-- Wildlife Habitat(VT) <br />Industrial/Commercial(IC) <br />14. Method of Mining: Briefly explain mining method (e.g. truck/shovel): <br />Dozer and front end loaders remove material from banks and take to crusher, & wash plant. <br />11 15. On Site Processing: 7 Crushing/Screening <br />13.1 Briefly explain mining method (e.g. truck/shovel): <br />Crush and wash rock and sand for the use of making concrete, and other construction materials. <br />List any designated chemicals or acid-producing materials to be used or stored within permit area: <br />None <br />16. Description of Amendment or Conversion: <br />If you are amending or converting an existing operation, provide a brief narrative describing the proposed change(s). <br />We are converting our limited 110 permit to a regular 112 The limited 110 permitted acreage <br />sets within the boundary of a 42.69 acre parcel which we are permitting. This is being done to <br />permitting this acreage it will allow both Grand County and Mountain Park Concrete to make the <br />es use o o properties.