My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-05-20_REVISION - M1998034
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1998034
>
2010-05-20_REVISION - M1998034
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 5:55:56 PM
Creation date
5/20/2010 2:45:58 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1998034
IBM Index Class Name
Revision
Doc Date
5/20/2010
Doc Name
Conversion from 110c to 112c application
From
Mountain Park Concrete, Inc.
To
DRMS
Type & Sequence
CN1
Email Name
ECS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
49
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Pi <br />RECLAMATION COSTS <br />EXHIBIT L <br />This reclamation cost estimate is based on the assumption that there will be no more than 22 <br />acres t disturbed at any one time. The following information also depicts a worst case scenario. At that <br />time we will have to respreads 14,750 cubic yards of topsoil, do 52,087 cubic yards of cut/fill dozer <br />work, and revegetate 22 acre t. The table below outlines the various areas of disturbance at that time. <br />The amount of topsoil that will be re-spread is based on an average of 5 inches. A dozer will be used to <br />do all of the dirt work and a motor grader will be used to do the seed bed preparation. These figures are <br />then used in the calculations for the bond amount. The revegetation cost figure Includes grass seed <br />costs. <br />STAGE TOTAL SOIL DEPTH <br />NEEDS RESOILING 22 511 <br />NEEDS SEEDING 22 <br />SLOPE CUT/FILL 1250 Ft. @ 41.67 yd. /LFT <br />RESOIL @ 5" 14,750 cubic yards <br />ESTIMATED UNIT COSTS FOR RECLAMATION ITEMS: <br />1. Revegetation includes grass seed mix and labor to drill ..................... $ 500.00/acre <br />2. Re-spreading soil and/or growth media with dozer, push distance less than 200.... 0.46/YD3 <br />3. Sloping using cut/fill method with dozer, push distance less than 200 .......... 0.51/YD3 <br />4. Grading and shaping seed bed using a motor grader ....................... $ 48.53/acre <br />RECLAMATION COSTS <br />1. Revegetation, 22 acre @ $500.00/acre ...................... ............. $11,000.00 <br />2. Resoiling, 14,750 yd3 x $ 0.46/yd3 ....................................... $ 6,785.00 <br />3. Sloping using cut/fill method 52,087 yd3X$ 0.51/yd 3 ....................... $ 26,564.00 <br />4. Grading and shaping 22 acre @ $ 48.53/acre ............................ $ 1.067.00 <br />Net Total $ 45,416.00 <br />5. Indirect costs <br />Mobilization . ........................................... $ 3,633.00 <br />Insurance, Bond, & Profit ........................................... $ 8,401.00 <br />6. Administration costs ................................................. $ 2,270.00 <br />TOTAL ESTIMATE $ 59,720.00 <br />RECOMMEND BOND BE SET AT $ 60,000.00 <br />Figured using Cat Handbook and rental costs from local sources for 83% efficiency, for eastern Colorado. <br />is
The URL can be used to link to this page
Your browser does not support the video tag.