My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-05-20_REVISION - M1998034
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1998034
>
2010-05-20_REVISION - M1998034
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 5:55:56 PM
Creation date
5/20/2010 2:45:58 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1998034
IBM Index Class Name
Revision
Doc Date
5/20/2010
Doc Name
Conversion from 110c to 112c application
From
Mountain Park Concrete, Inc.
To
DRMS
Type & Sequence
CN1
Email Name
ECS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
49
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I MINING PLAN <br /> <br />fl <br />11 <br /> <br /> <br /> <br /> <br />t <br /> <br />EXHIBIT D <br />The permit boundary area includes 9.95 acres. With this conversion the mining <br />plan will change to include the 42.69 acre parcel. In doing this conversion the <br />mining will proceed as started with the previous permit. The 42.69 acre parcel <br />which is divided by a deep draw running East to West will be mined from North to <br />South. The deep draw will be the dividing line between the two phases. During <br />the first phase on the northern end mining will continue as started and moving in <br />an easterly direction and then to the south. <br />PHASE 1 <br />During the first phase overburden and topsoil will be stored on the boundary of <br />the permitted area and used for material to construct berms along County Road <br />#3 to minimize visual impacts. Some material will also be used to construct a <br />crossing across the drainage. As the mining reaches completion in phase 1 there <br />will be a transition period in which mining will begin in the second phase while <br />material stockpiles are still in the first phase. Mining will proceed from North to <br />South in the second phase. Reclamation will proceed along with the mining <br />process. Areas that are completed from mining will be reclaimed on an ongoing <br />basis. <br />MINING TIMETABLE <br />This estimated mining timetable is based on an average year. Mountain Park <br />Concrete does not expect any specific year to vary widely from the average. If <br />there are changes in the mining timetable we will discuss the reasons for the <br />change in the annual report that follows the change and modify it at that time. <br /> <br />PHASE ESTIMATED YEARS <br />#1 17-25 yrs. <br /># 2 20 - 30 yrs. <br />7
The URL can be used to link to this page
Your browser does not support the video tag.