amec <br />Earth & Environmental <br />Location This Week <br />(tons) Cumulative <br />(tons) Comments <br />E Cresson Clay Processing 6,634 89,560 <br />S Cresson Clay Processing 0 201,199 Processing in area complete. <br />Squaw Gulch Processin 0 35,816 Processing in area com lete. <br />Total 6,634 321,964 <br />2) Low Volume Solution Collection Fill Material (LVSCF) <br />Processing of Low Volume Solution Collection Fill material continued at the Dump 4 LVSCF <br />Process. A CAT D-10 dozer and a skid steer loader were used to process the material. <br />Location This Week Cumulative Comments <br /> (tons) (tons) <br />Dump 4 LVSCF Processing 9,847 296,909 <br />G) Miscellaneous <br />No work was performed during the week. <br />III) Underground Workings <br />A) Drilling/Excavation <br />No work was performed during the week. <br />B) Mine Shaft/Stope Remediation <br />No work was performed during the week. <br />C) Lateral/Slot Remediation <br />No work was performed during the week. <br />IV) Storm Water Management Structures <br />A) Control Structures <br />No work was performed during the week. <br />B) Best Management Practices <br />Best Management Practices are being observed throughout the Phase 5 VLF Project. Storm water <br />controls were maintained throughout the week. Precipitation was not substantial throughout the <br />week. <br />Storm water controls are being constructed in the East Cresson Clay Borrow as needed. <br />V) VLF Geosynthetics <br />Four loads of 100mi1 LLDPE geomembrane were delivered to site during the week for a total of 45 <br />rolls. All loads were delivered on flat bed trucks in good condition. The rolls were unloaded using a <br />CAT 966 front-end loader with forks attached. The geomembrane was placed on three pieces of 4" <br />HDPE pipe, staked two rolls high. An AMEC field representative was present at all times during <br /> <br />VLF Weekly Report WE 05.01.10.1)