Laserfiche WebLink
sheet 1 of 2 <br />CIRCES Cost Estimatina Software <br />SCRAPER TEAM WORK <br />PROJECT IDENTIFICATION <br />Task # <br />Date <br />User <br />w 6x <br />HOURLY EQUIPMENT COST <br />Shift basis : 1 per day <br />Agency or organization name : DRMS <br />002 State : Colorado <br />05/19/2010 <br />BMK <br />Permit or other job action : Warrnty Calulation After Inspection/ Tr <br />Task description :APPLY 6 INCHES OF TOP SIL OVER 60 ACRES <br />Equipment Description <br />Scraper work team -Scraper : Cat 637G w/push-pull <br />-Push dozer: NA <br />Support equipment -Load area : CAT 143H <br />-Dump area <br />Cost Bre <br />Road maintenance -Motor grader : NA <br />-Water truck : NA <br />akdown : Scraper Work Team <br />Scraper Dozer Support Equipment <br />Load area Dump area Road Maintenance Equipment <br />Grader Water truck <br />Import data filename : scraper2 NA grader NA NA NA <br />% Utilization-machine : 100 NA 40 NA NA NA <br />-Ripper attachment : NA NA NA NA NA NA <br />Ownerhip cost/hour : $109.89 NA $31.80 NA NA NA <br />Operating cost/hour : $173.96 NA $15.59 NA NA NA <br />Ripper op. cost/hour : NA NA $0.00 NA NA NA <br />Operator cost/hour : $38.72 NA $38.91 NA NA NA <br />Unit subtotals : $322.57 NA $86.29 NA NA NA <br />Number of units : 4 0 1 0 0 0 <br />Group subtotals : Work : $1,290.28 Support : $86.29 Maintenance : $0.00 <br />Total work team cost/hour : $1,376.57 <br />X:.;;:.: ::.:::::::::::::::::::::.::::::::::::::::.:::::.:.............................................. <br />MATERIAL QUANTITIES <br />Initial Swell Loose <br />volume : 34,216 LCY factor : NA volume : 34,216 LCY <br />Source of quantity take-off : tr <br />Source of estimated swell factor : NA <br />County :Pueblo <br />Site : Ceasar Pit <br />Permit/job #:M-1998-101 <br />Abbreviation :none <br />Filename :M101-002